Similar Projects
Last Updated | 05/11/2023 03:39 PM |
Project Title | Moore Animal Shelter - Bid Package #2 |
Physical Address | View project details and contacts |
City, State (County) | Moore, OK 73160 (Cleveland County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Package #2. Work includes: General Trades, Concrete, OH Doors and Pre-engineered Metal Building All questions shall be furnished in writing via email to:Justin Lockwood: jlockwood@crossland.com Manufacturer-engineered, shop-fabricated structural steel building frame. B. Metal wall and roof panels including exterior metal sliding barn doorl. Bid Location: Moore City Hall 301 N Broadway, Suite 142 Moore, Oklahoma 73160 Line items listed below are specific to this project and general in nature. All costs associated shall be included within the base bid for this trade contract. Scopes listed shall be priced in their entirety (inclusive of all labor, material, means of conveyance, supervision, and equipment) for a complete and finished system per the contract documents. 1) Bid Pricing is to be based off of the added scope for this project included in Revision #2 dated April 14 th , 2023 by Barrett L. Wiliamson Architects. Original documents are included for reference. 2) Provide and install all pen posts, fence panels, horse stall panels, stall gates and all required hardware and finishing. Include required corner posts and in wall support as required for a complete installation. 3) Provide and install sliding agricultural door. Include all required structural support, finishes and hardware for a complete installation. 4) Provide and install galvanneal dutch doors and hollow metal frames complete. Include all necessary structural support, finishes and hardware for a complete installation. 5) Provide and install 60 LF of retaining wall on east side. West 214 LF is to be excluded as it is included in a previous contact. 6) Provide and install horse stall mats. The Project consists of the construction of a new Animal Shelter facility and associated outbuildings and sitework. |
||||||||||||||||||||||||||||||||
Details | 25,051 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |