Similar Projects
Removal and Installation of Roof Top HVAC Unit Sign Shop
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

Removal and Installation of Roof Top HVAC Unit Sign Shop Office
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Common Area HVAC Modernization- Vicksburg Halls
Post-Bid
Marysville, MI

HVAC Services
Results
Howell, MI

HVAC Systems Improvement and Roofing System Replacement Design and Construction Administration Services
Results
Adrian, MI 49221

Removal and Installation of Roof Top HVAC Unit District 9 Shop
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

Transfer Switch, Electrical & Gas Line Upgrades
Post-Bid
Dearborn, MI

Heating and Cooling Systems Maintenance and Repair Contractor
Term Contract
Results
Sterling Heights, MI

Heritage Manor Furnace Replacement
Renovation
Sub-Bidding
$55,000 CJ est. value
Houghton, MI 49931

Furnace Installation-USCG Station Holland
Post-Bid
Holland, MI

Chiller and Liebert Climate Control Preventative Maintenance Services
Results
Utica, MI

HVAC Upgrade
Post-Bid
Less than $1,000,000 est. value
Flat Rock, MI

Fume Hood Filters Replacement
Results
Ann Arbor, MI 48105

Bid Package 7 Bi Polar Ionization
Post-Bid
Saint Clair Shores, MI

Last Updated 08/17/2022 12:34 PM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Chassell, MI 49916   (Houghton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Chassell Township Schools will not consider or accept a bid received after the above-specified date and time for bid submission. The Board of Education reserves the right to waive any irregularity or informality in its bid process, to reject any or all Bids, to award the work by component, group of components, or total project, and to accept the Bid(s) which the Board determines will perform in the school district's best interests and will be the lowest responsible bidder(s) as required by law. Each bid must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the school district or any employee of the firm submitting the bid and the Superintendent of Chassell Township Schools or any member of the Board of Education, as well as a certification of Iran-linked business status. Bids are to be presented in accordance with the Bidding Documents, which shall be made available at Chassell Township Schools, or by submitting a request to Marco Guidotti at (906) 483-2132 x.401 or via email at guidottim@cts.k12.mi.us Specifications: Removal of 2 existing Lochinvar boilers Provide and install 2 new LOCHINVAR FTXL 500,000 BTU BOILERS Provide 2 new boiler pumps properly sized for boilers Install a 2.5" magnetic separator between the boilers and main system pumps in a serviceable location Treat existing system with Fernox Cleaner prior to project Flush system to best of abilities Treat system with Fernox protector upon completion Estimated system volume 200 gallons Price to include near boiler piping and electrical Price to include boiler permit Reuse current expansion tank and water feed Reuse current system pumps

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Heating Boilers, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents