Similar Projects
Construction Manager at Risk Services - Well 20 Improvement - Market Place
Bidding
Tempe, AZ

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Bidding
Phoenix, AZ

Fuel Pump Dispenser Replacement
Post-Bid
Tucson, AZ

Fuel Pump Maintenance & Repairs at Grand Canyon NP
Post-Bid
Grand Canyon, AZ

Z--Yuma - 242 Well Expansion
Results
$1,000,000 to $5,000,000 est. value
Yuma, AZ 85364

Y--Construct a Secondary Water Well at Temple Bar, La
Results
$250,000 to $500,000 est. value
AZ

Watson Wash Well Abandonment
Post-Bid
Phoenix, AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Clean Evaluate Well
Results
Glendale, AZ 85309

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Valentine Well
Results
Phoenix, AZ 85027

Pricing Drilling and Construction of Multiple Irrigation Wells
Post-Bid
Maricopa, AZ 85138

Irrigation Pump Replacement
Results
Lake Havasu City, AZ 86406

F--Bodaway-Gap Well Installation
Post-Bid
$100,000 to $300,000 est. value
Tuba City, AZ

Last Updated 04/14/2021 08:42 AM
Project Title

Carrizo Production Wells

Physical Address View project details and contacts
City, State (County) Fort Apache, AZ   (Navajo County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all plant, labor, tools, equipment, and materials required for the construction and performing all operations in connection with the drilling, construction, development, test-pumping, and water quality sampling of the test wells. Each well MAY include an initial 8-inch (8”) pilot hole. Depending on results from the pilot-hole drilling and testing, the work will also include either reaming the hole to 14.75” and installing a production well or abandonment of the hole(s).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents