Similar Projects
Curtain Wall Replacement At Tyson Hall
Bidding
$2,780,000 to $3,340,000 est. value
West Chester, PA 19383

High School CTE Wall Retrofit Project
Bidding
Jersey Shore, PA 17723

Donor Wall Design & Installation
Post-Bid
Harrisburg, PA

Sub B and B Stadium Station Project
- 4,173 SF
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Improvements to Sharps Landing
Results
Less than $50,000 est. value
Sharpsburg, PA

High School Auditorium Acoustic Panels and Installation
Results
Middletown, PA

Ceiling Tiles
Bidding
Less than $25,000 est. value
Philadelphia, PA

Pre-Assembled Metal Lockers and Benches
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Abeloff Plaster Ceiling Repairs
Results
East Stroudsburg, PA

Installation of a Dryvit System on Side Wall
Post-Bid
York, PA

Rehabilitate Control Tower Catwalk and Ladders/Railings
Results
New Cumberland, PA 17070

Pedestrian Stair Replacement Phase II
Post-Bid
McKees Rocks, PA 15136

Interior/Exterior Door Signage
Results
Philadelphia, PA

Ground Level Waterproofing and Site Improvements for the Moore Elementary School - General Construction
Post-Bid
Pittsburgh, PA 15227

Track Wall Paneling for 13Th Street Trolley Station
Results
Less than $25,000 est. value
PA

Last Updated 01/18/2019 04:08 PM
Project Title

56--Salt Shed Insulation at Erie VA Medical Center SDVOSB Set-Aside

Physical Address View project details and contacts
City, State (County) Erie, PA 16504   (Erie County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Erie VA Medical Center had a construction project to replace the existing Boiler Plant. The new Boiler Plant captured the existing salt shed. Insulate walls and ceiling: 6.1.1 Supervise work force mobilized. 6.1.2 Prep surface to be sprayed. 6.1.3 Protect floors, doors, heating system from overspray. 6.1.4 Spray 2" Demilec Heatlok XT closed cell spray foam on all accessible walls and roof. 6.1.5 Spraying consist of 3,000 square foot of area. 6.1.6 Clean work area. Spray fireproofing on steel: 6.2.1 Supervise work force to mobilize: 1. 6.2.2 Prep surfaces to be sprayed. 2. 6.2.3 Protect floors, doors, heating systems from overspray. 3. 6.2.4 Apply "Paint to Project DC-315" thermal coating over all exposed spray foam insulation. 4. 6.2.5 Spray beams for 3,000 square foot area. 5. 6.2.6 Clean up work area.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Flooring, Painting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents