Similar Projects
Plugging Wells
Term Contract
Post-Bid

Plugging Wells
Term Contract
Post-Bid

AFB Landfill Gas Wellfield Expansion
Infrastructure
Results
$455,000 est. value
Fargo, ND 58102

Reclaim 11 Wells - East
Infrastructure
Results
ND

Well Equipment Removal Package 1
Demolition
Post-Bid

Reclamation of Wells - Package 2
Infrastructure
Results
Bismarck, ND

Well Equipment Removal Package 2
Demolition
Post-Bid

Reclamation of Wells - Package 3
Infrastructure
Results
Bismarck, ND

Last Updated 09/20/2021 08:56 AM
Project Title

Reclamation of Wells - Package 1

Physical Address View project details and contacts
City, State (County) Bismarck, ND   (Burleigh County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This bid should include the full cost to reclaim the well sites and facility sites. 1) contact landowner and go over the reclaim plan. 2) Remove surfacing material from site. 3) Remove contamination down to 4’ or to levels of 10,000 ppm with no free product for TPH and Electrical conductivity (EC) of 2000 micro siemens/cm. 4) Recontour the site, rip the site to alleviate compaction, and spread 6 inches of topsoil. 6) Seed with native grass or seed specified by landowner. Below is the list of sites: Erickson CTB - NWSE- Section 27-T152N-R103W WFN 11143 - Erickson D 1 - SENW Section 27 T152N R103W WFN 11144 - Lassey-Erickson A 1 - NENE Section 28 T152N R103W ML Lassy CTB - SWSW- Section 34-T152N-R103W WFN 11177 - Lassey-Myers A 1 - NENE Section 33 T152N R103W WFN 11499 - A.M. Lassey A 1 - NESW Section 33 T152N R103W WFN 10439 -M. L. Lassey 1 - SWSW Section 34-T152N-R103W Monson CTB - NENW - Section 32-T152N-R103W WFN 11157 - Lindsley-Dobias State 1 - NESW Section 29 T152N R103W WFN 11340 - Dobias State A 1 - NESE Section 30 T152N R103W WFN 11355 - Dobias Monson Well 1 - NENW Section 32 T152N R103W WFN 11458 - Monson 3-32 - NWSE Section 32-T152N-R103W - Reseed with Native grass seed mix.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents