Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Environmental Health and Safety Warehouse
- 11,000 SF
Design
Tuscaloosa, AL 35487

Ruby Tyler West Wing Renovation
Renovation
Bidding
$550,000 est. value
Tuscaloosa, AL

Taylor Hardin Phase 2 CEP Addition/Renovation
Renovation, Addition
Bidding
$6,500,000 est. value
Tuscaloosa, AL 35404

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Kappa Delta Kitchen Improvements
Renovation
Post-Bid
Less than $100,000 est. value
Tuscaloosa, AL

Air Force Contract Augmentation Program (AFCAP) V
Results

Paty Hall Manufacturing Facility Fit-Out
Results
Tuscaloosa, AL

Math and Science Education Building Renovation - Package B
Renovation
Construction
Less than $23,077,925 est. value
Tuscaloosa, AL 35487

Frank Moody Music Building Restoration
Renovation - 32,914 SF
Construction
Less than $6,000,000 est. value
Tuscaloosa, AL 35401

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Alpha Phi Servery Renovation
Renovation
Results
$250,000 est. value
Tuscaloosa, AL 35487

Environmental Health and Safety Warehouse
Construction
$2,232,745 est. value
Tuscaloosa, AL 35404

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Last Updated 08/19/2021 12:03 PM
Project Title

Smart Communities & Innovation Building Electrical Vehicle Facility

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL   (Tuscaloosa County)
Category(s) Education, Government/Public
Sub-Category(s) College/University, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Bidding Expected second quarter 2022
Bids Due View project details and contacts
Estimated Value $16,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Smart Communities and Innovation Building project will entail renovating the former 1-North building on Peter Bryce Campus and will become the new home of The Alabama Transportation Institute (ATI), the Alabama Department of Transportations (ALDOT) West Central Regions Transportation Systems Management Operations and other strategic partners to develop and open a regional transportation management center and collaborative research center located on the UA campus. The Project will entail a total renovation of the approximately 66,500 gross square foot three (3) story building. The renovation will include the installation of all new building systems including life safety, HVAC, elevator, electrical, information technology, security and access control, and other systems as required to bring the facility in line with University enterprise systems and current code and to meet the functional needs of the programs. A building envelope assessment will be performed, and issues addressed as appropriate. The roof will be replaced as part of the Project. The structure and single column bay layout of the building is ideally suited to open office format. This format provides for flexible future program and space use and yields a lower cost of construction. The Project also includes approximately 3,000 gross square feet of addition for an enhanced lobby space and vertical circulation. The Project will be bid with alternates to fit out portions of the 3rd floor. Site enhancements will include creating a distinct entrance with a covered drop off and a designated parking area for visitors and accessible spaces for the building in the area immediately northwest of the building along with providing drive access to the loading dock and service area for the building. The site will be landscaped to University standards, all service areas will be appropriately screened, and appropriate pedestrian connectivity and lighting will be included. The facility will also include significant network infrastructure and connectivity to support research and operational needs including the regional Transportation Systems Management and Operations (TSMO) Center.

Details

66,500 SF - College/University, New Construction, Misc. Buildings, 66,500 SF Renovation, Misc. Buildings, 3,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents