Similar Projects
Fresh Water System Transmission Line 2019 Colonias Infrastructure Fund
Infrastructure
Bidding
$700,000 to $790,000 est. value
Lake Arthur, NM

Verano and Conchas Loops Waterline and Service Lateral Replacements
Infrastructure
Bidding
$300,000 est. value
Santa Fe, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

The Heredia Community Ditch Association
New Construction
Post-Bid
San Lorenzo, NM

Valle Del Rio Water System Improvements
Results
La Mesa, NM

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System SCADA Study
Infrastructure
Bidding
Los Alamos, NM

Water System Improvements
Post-Bid
$540,000 to $610,000 est. value
Tatum, NM

Pena Blanca Water and Sanitation District Water System Improvements
Results
Pena Blanca, NM 87041

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Construction of the Union Del Llano Phase II Water System Improvements
Results
Llano, NM 87543

Engineering Services for Pinecliff Water and Sewer System Improvements
Post-Bid
Ruidoso, NM

Mountain View Waterline Extension
Results
$500,000 to $700,000 est. value
Moriarty, NM 87035

Water System Improvements - Phase III
Post-Bid
Melrose, NM

Wastewater Collection Lines
Results
Socorro, NM 87801

Last Updated 04/18/2022 01:55 PM
Project Title

Lincoln Strong Vege Waterline Replacement

Physical Address View project details and contacts
City, State (County) NM   (McKinley County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of installing new 6-inch waterlines in Lincoln Avenue, Strong Drive and Vega Avenue in Gallup, NM. The Lincoln-Strong-Vega waterline will consist of installing approximately 2,800 linear feet of new 6-inch waterline starting from the intersection of Lincoln Avenue 3rd Street and will go east on Lincoln Avenue to the intersection of Lincoln Avenue Strong Drive. The new waterline will run north on Strong Drive towards the intersection of Strong Drive Vega Avenue and will turn east on Vega Avenue ending at the intersection of Vega Avenue Cliff Drive. Work shall include fittings, specials, trenching, backfilling, compaction, waterline tie-ins, transfer of existing water services, existing waterline removal, waterline abandonment and traffic control. Sidewalk, curb and gutter, and asphalt removal will also be required.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents