Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Brush Prairie Baptist Church Addition
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Vancouver, WA 98662

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Asphalt Overlay and Court Paint Resurfacing of the Pickeball Court
Infrastructure
Post-Bid
Washougal, WA 98671

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

SR 500 / I-5 to NE 112th Ave Vicinity - Replace Fiber
Infrastructure
Design
$553,000 CJ est. value
Vancouver, WA 98682

Overlook Park Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ridgefield, WA 98642

Last Updated 08/24/2022 03:02 PM
Project Title

Pleasant Valley Pump Station

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98686   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of August 24, 2022 the project is in early planning stage. A pre-application meeting was held March 31, 2022 with the Clark County Community Development department. No additional submissions have been made to the county. Information regarding the developer, architect, general contactor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents