Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation
Bidding
Mount Carroll, IL 61053

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation - 49,875 SF
Post-Bid
Mount Carroll, IL 61053

Savanna 2021 MFT Roadway Improvements
Infrastructure
Results
$725,000 est. value
Savanna, IL 61074

Freedom Road District Road Resurfacing
Infrastructure
Results
IL

Timber Lake Playhouse
Demolition, Infrastructure, Build-out, Renovation - 20,032 SF
Bidding
$400,000 CJ est. value
Mount Carroll, IL 61053

Washing Three Bridges Over the Mississippi River, Carroll County (SN008-0052) Carrying US 52/IL 64
Infrastructure
Post-Bid

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Deck Repair, and Installation of Deck Concrete Wearing Surface
Infrastructure
Bidding
$700,000 CJ est. value
Mount Carroll, IL 61053

Washing Six Bridges Over the Rock River, in Henry, Rock Island and Whiteside Counties
Infrastructure
Post-Bid

RR-21-4821 Pavement Repairs
Infrastructure
Results

Bridge Deck Sealing of 3 Structures
Infrastructure
Bidding
$700,000 CJ est. value
Mount Carroll, IL 61053

Washing Eight Bridges at Various Locations in Henry, Lee, Ogle, Stephenson and Whiteside Counties
Infrastructure
Post-Bid

4th Street Reconstruction, Drainage and Water System Improvements
Infrastructure
Results
$709,800 CJ est. value
Milledgeville, IL 61051

Last Updated 12/28/2022 07:32 AM
Project Title

Beam End Repairs, Expansion Joint Replacement and Installation of Concrete Wearing Surface on SN 008-0015

Physical Address View project details and contacts
City, State (County) Savanna, IL 61074   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $694,355 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Beam end repairs, expansion joint replacement and installation of concrete wearing surface on SN 008-0015 carrying IL 84 over Rush Creek, 3.1 miles South of JoDaviess County line. Region 2 District 2 Federal Project # NHPP-X35X(505) County(s) Carroll Key Route(s) FAP 308 Marked Route(s) IL 84 Section(s) (104 BY-R)BDR State Job #(s) C-92-075-22 PPS #(s) 2-20502-0000 Completion Date : 45 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 012 - Beam End Repairs, Expansion Joint Replacement and Installation of Concrete Wearing Surface on SN 008-0015

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents