Similar Projects
Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

Construction Manager at Risk - West Stadium Renovation and Corbett Natatorium Addition
Renovation, Infrastructure
Post-Bid
$3,000,000 est. value
Laramie, WY

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Post-Bid
$170,000,000 CJ est. value
Laramie, WY 82070

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

North Tank and Pipeline Project
Infrastructure
Results
$18,148,591 CJ est. value
Laramie, WY 82070

Rail Tie Wind Project
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Tie Siding, WY 82084

Plenty Unlimited
New Construction, Infrastructure - 60,000 SF
Pending Verification
$32,000,000 CJ est. value
Laramie, WY 82070

Storm & Street Rehabilitation - C line Ph 2 - City of Laramie
Infrastructure
Conception
$230,000 CJ est. value
Laramie, WY 82070

RFP for Design Services - B2 Line Repl - Spring Creek Corthell to 15th - WWC-CP19014 - City of Laramie
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Laramie, WY 82072

Wastewater Line Rehabilitation - Sully and Canby, 3rd and 4th
Infrastructure
Results
$82,235 CJ est. value
Laramie, WY 82070

Street Reconstruction - Willett Drive - MCW-CP22-010 - City of Laramie
Infrastructure
Conception
$1,060,000 CJ est. value
Laramie, WY 82072

New Restroom Facility
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Laramie, WY 82070

District 1 Crack Seal
Infrastructure
Results
$1,562,408 CJ est. value
Bosler, WY 82051

Last Updated 03/15/2023 02:01 PM
Project Title

RFQ Contractor - Jonah Field Turf Replacement

Physical Address View project details and contacts
City, State (County) Laramie, WY 82072   (Albany County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of entire synthetic turf playing surface at War Memorial Stadium - Jonah Field, including regrading of existing aggregate base to manufacturer tolerances, markings and graphics similar to the existing field, that are in compliance with current NCAA regulations. Question Deadline 02/24/2023 at 4:30 PM MT Last day to submit Questions/Substitution Requests A. Removal and disposal of the existing synthetic turf. B. Regrade existing aggregate base to turf manufacturer tolerances. There are two (2) known minor depressions at the south edge of the existing surface, outside the playing field, in need of repair. C. Installation of new in-filled grass synthetic turf upon existing bases (-82,000 s.fi). 1. Field markings for Football, per current NCAA Rules. 2. Outlined Football numbers, mid-field and conference logos, and endzone, midfield, and sideline graphics, similar to the existing field. Final design must be approved by Owner before fabrication. D. Remove and reinstall goalpost, if required. E. (1) G-max test at completion. F. Final cleaning/ grooming. G. Close-out documentation including as-built drawings and specifications, submittals, and O&M manual. H. 10-year warranty for new synthetic turfsurface. I. Add-Alternates: 1. Expand Coaching Box and Team Area to 20-yard line, in both directions, on both east and west sides. a. Sawcut and remove existing concrete and base in four (4) locations (-240 s.f. total). b. Provide and install permeable aggregate base/ sub-base, and in-filled grass synthetic turf, to manufacturer's specifications. Remove and relocate existing turffabric attachment nailer, or provide new, as required. 2. Investigation of the existing base/ sub-base. To be completed as soon as field availability and weather conditions allow. a. Open existing turfto access existing condition in four to six (4-6) locations for investigation. b. Pothole by hand down to top of existing drainage pipe in minimum of two (2) locations. Backfill upon completion. c. Onsite permeability testing of exposed aggregate. d. Sampling of aggregate for laboratory gradation testing. e. Seam existing turf back immediately upon completion. f. Provide report of investigative findings. 3. Investigation of existing field drain system by camera -- assume 800-1200 l.f. On-site work will be able to commence after the football Spring Game, April 30, 2023. The tentative Substantial Completion date is July 1, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents