Similar Projects
Secondary Non-Potable Water Storage Facility - City Of Brentwood
Alteration
Conception
$3,500,000 est. value
Brentwood, CA 94513

Synthetic Natural Gas (SNG) Back-Up System
Infrastructure
Bidding
$2,000,000 est. value
Vacaville, CA 95687

Arrow Maintenance Facility (AMF) Hydrogen Fuel Upgrade Project: Hydrogen Fuel System (HFS)
Infrastructure
Bidding
$4,000,000 est. value
San Bernardino, CA 92410

Above Ground Fuel Storage Tank
Infrastructure
Post-Bid
San Jose, CA

J045--Fuel Filtering/Underground Tanks / Generators
Term Contract
Post-Bid
Loma Linda, CA 92357

Propane Repairs at Death Valley National Park
Term Contract
Results
Death Valley, CA

Above Ground Fuel Storage Tank and Dispensing Systems
Alteration
Results
Auburn, CA

Bollman Water Treatment Plant Chemical Storage Improvements, Phase 2 and Seismic Strengthening - District Furnished Materials
Infrastructure
Bidding
Concord, CA 94520

Fuel Tank Filtering and Cleaning
Term Contract
Post-Bid
Los Angeles, CA 91343

Fuels Tank Inspection EDW
Term Contract
Results
Edwards, CA

CNG Station Maintenance Program
Term Contract
Bidding
Sanger, CA

Fuel Filtering, Tank Cleaning and Lab Testing
Term Contract
Post-Bid
Long Beach, CA 90822

Diesel Underground Storage Tank Removal
Demolition
Results
Oceanside, CA

Fuel Tank Footlings
Infrastructure
Bidding
$58,000 est. value
Lathrop, CA 95330

Maintenance of Natural Gas Pipeline
Alteration
Post-Bid
Herlong, CA 96113

Last Updated 07/11/2022 02:08 PM
Project Title

Unit 8 Second Gap Connection Pipeline

Physical Address View project details and contacts
City, State (County) Lakewood, CA   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, materials, equipment, supplies and incidentals required to construct the Unit 8 Second Gap Connection Pipeline

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents