Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Main Street Courts
New Construction, Build-Out - 39,456 SF
Design
$2,500,000 est. value
Davie, FL 33314

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Publix Training Center & Lift Station
Build-Out - 3,157 SF
Bidding
Lakeland, FL 33815

Construction Manager at Risk Services for New Solid Waste and Utilities Administrative Building
New Construction - 15,000 SF
Bidding
Plant City, FL 33563

Former AT&T Building
New Construction, Renovation - 116,650 SF
Post-Bid
Orlando, FL 32801

North Florida Innovation Labs
New Construction - 40,000 SF
Post-Bid
$10,200,000 est. value
Tallahassee, FL 32310

Crews Riverside Park Pavilion
New Construction - 550 SF
Results
Wauchula, FL 33873

LSSA WWTP Refurbish Wet Lab
Results
Less than $150,000 est. value
The Villages, FL 32159

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Lutgert Professional Center
New Construction - 38,000 SF
Construction
$14,000,000 est. value
Naples, FL

Historic Central Fire Station Reuse
Renovation - 9,600 SF
Pending Verification
Jacksonville, FL 32202

Santander Consumer USA
Renovation - 115,425 SF
Pending Verification
$9,500,000 est. value
Odessa, FL 33556

Palmer Lakes Logistics Center
New Construction, Build-Out - 603,418 SF
Conception
Miami, FL 33142

Last Updated 04/14/2022 09:08 AM
Project Title

Sivia Center New Freezer and Cooler Renovations

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32609   (Alachua County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work for the New Freezer and Cooler Renovations at the Sivia Center includes, but is not limited to, the following: Cutting and patching, selective structure demolition, concrete forming and accessories, concrete reinforcing, cast-in-place concrete, concrete finishing, metal fabrications, blanket insulation, joint protection, door schedule, hollow metal doors and frames, rolling service doors, door hardware, glazing, finish schedule, gypsum board assemblies, nonstructural metal framing, acoustical panel ceilings, resilient flooring accessories, painting and coating, specialties and coordination with new walk-in freezers and cooler provided and installed by the Owner’s Vendor. Work also includes mechanical, fire protection and electrical work.

Details

Office, 20,550 SF Renovation.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents