Similar Projects
Construction Services for Jetty and Wing Wall Repairs In Kennebunk and Kennebunkport, Maine
Design
$1,000,000 to $5,000,000 est. value
Kennebunk, Kennebunkport, ME

Large Culvert Rehabilitation
Infrastructure
Bidding
Union, ME

In Stream Culvert Replacements
Infrastructure
Bidding
Boothbay, ME

2019 Grants for Stream Crossing Public Infrastructure Improvements
Post-Bid
Less than $125,000 est. value
Augusta, ME

Corrugated Exterior/Smooth Interior Hdpe Culvert Pipe
Infrastructure
Post-Bid
Turner, ME

Large Culvert Replacement
Results
Columbia, ME 20588

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Drainage Improvements
Infrastructure
Bidding
Lincoln, ME

Spaulding Lake Road Culvert Replacement
Infrastructure
Post-Bid
Oakfield, ME 04763

Two Bartlett Brook Stream Crossing Upgrades
Results
Naples, ME

2022 Little John Lane Storm Drain Replacement and Erosion Control Project
Infrastructure
Bidding
Brewer, ME

Approximately 5,280 Feet of Ditching and Replacing Culverts
Infrastructure
Post-Bid
Patten, ME

Large Culvert Replacement
Results
Less than $645,000 est. value
Bridgton, ME 04009

Stream Crossing Improvements at Jacob Buck Pond Road and Bucksmills Road
Infrastructure
Bidding
Bucksport, ME

2021 Grants for Stream Crossing Infrastructure Improvements
Infrastructure
Post-Bid
Augusta, ME

Last Updated 04/04/2022 01:54 AM
Project Title

Slope Stabilization

Physical Address View project details and contacts
City, State (County) Canton, ME 04221   (Oxford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Oxford County, project is located on Rte. 140 beginning 0.45 mi. easterly of Canton Point Rd. and extending westerly 0.31 mi.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents