Similar Projects
Mid-Michigan/GKB Pathway Connections - City of Mount Pleasant
Infrastructure
Conception
$1,205,000 CJ est. value
Mount Pleasant, MI 48858

Mid-Michigan/GKB Pathway Connections - City of Mount Pleasant
Infrastructure
Conception
$1,205,000 CJ est. value
Mount Pleasant, MI 48858

Sam's Club #4982-211 Fuel Station / Mount Pleasant
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Mount Pleasant, MI 48858

Water System Upgrades Contract 1
Infrastructure
Bidding
$1,200,000 CJ est. value
Shepherd, MI 48883

Water System Upgrades Contract 1
Infrastructure
Bidding
$1,200,000 CJ est. value
Shepherd, MI 48883

Bridge Support - Epoxy and Healer Sealer
Renovation, Infrastructure
Post-Bid

Hot Mix Asphalt Road Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Signing, and Pavement Markings
Infrastructure
Post-Bid
$654,445 CJ est. value
Mount Pleasant, MI 48858

2022 Illinois Street Reconstruction Project
Infrastructure
Results
Mount Pleasant, MI 48858

2022 Alley Reconstruction Project
Alteration
Results
$128,000 est. value
Mount Pleasant, MI

Bandit Industries / Broomfield Township
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Mount Pleasant, MI 48858

Wilson Industies Office Building
Addition, Demolition, Infrastructure - 55,038 SF
Pending Verification
$9,000,000 CJ est. value
Mount Pleasant, MI 48858

Runway 9/27 Rehabilitation - City of Mount Pleasant
Infrastructure
Conception
$2,583,000 CJ est. value
Mount Pleasant, MI 48858

Water System Upgrades Contract 2 - Water Meter Replacements
Infrastructure
Bidding
$400,000 CJ est. value
Shepherd, MI 48883

RFP D/B - Synthetic Turf Fields (Baseball and Softball)
Infrastructure
Post-Bid
$500,000 CJ est. value
Mount Pleasant, MI 48858

2022 Crapo Street Reconstruction Project
Alteration
Results
Mount Pleasant, MI

Last Updated 06/19/2023 07:35 AM
Project Title

M-20 Pedestrian Bridge - Superstructure Replacement

Physical Address View project details and contacts
City, State (County) Mount Pleasant, MI 48858   (Isabella County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $497,044 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000315440 Pedestrian bridge superstructure replacement along M-20 over the Chippewa River. Lane closure on M-20 will be required to place the new prefabricated bridge superstructure. See attached Maintaining Traffic special provision. Questions are submitted online No Direct all bid questions to pbiscorner@mt-pleasant.org.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents