Similar Projects
First Street Pond and Wastewater Pump Station
New Construction
Bidding
Grants, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Equip Brandy Well 1, an Existing Well with a Solar Pumping System
Post-Bid
Cuba, NM 87013

NGWSP 4c-8
Results
$100,000,000 est. value
Shiprock, NM

North Main Sewer Pump Station
Results
Aztec, NM 87410

Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

Effluent Loadout Station
Results
Less than $311,420 est. value
Los Lunas, NM

Band Replace Sewer and Water System
Post-Bid
$500,000 to $1,000,000 est. value
Los Alamos, NM 87544

Wastewater Lift Station Maintenance and Repair Services
Results
Las Cruces, NM 88007

Goat Summit Booster Station
Post-Bid
Mescalero, NM

Tank 4 to Tank 1 Booster Pump Station and Transmission Line
Results
Santa Fe, NM 87508

Glenwood Gila Trout Facility
New Construction
Post-Bid
Glenwood, NM

Valley Water and Sanitation District Booster Station
Results
Kirtland, NM 87417

Lift Stations and Forcemains
New Construction
Post-Bid
Ruidoso, NM 88345

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Reported 10/28/2020 12:00 AM
Project Title

Construction of Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Estancia, NM 87016   (Torrance County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of upgrades and improvements for each of the three (3) wastewater lift stations. Lift Station 1 will require installation of a new alarm panel and replacement of lid. Lift Station 2 will require installation of a new remote monitoring device on existing control panel. Lift Station 3 will require installation of a new control panel, portable hoist, and accessories. Improvements will also include the relocation of one (1) existing standby generator, installation of one (1) new standby generator, and installation of two (2) automatic transfer switches.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents