Similar Projects
Water Street Pump Station Upgrades Pump Procurement Project
Post-Bid
Ellsworth, ME 04605

Kennebec Sanitary District Main Pump Station Force Main Upgrade
Results
$640,000 est. value
Waterville, ME

Replacement Pump Station
Renovation
Results
Old Town, ME 04468

School Street Pump Station Improvements
Results
Unity, ME 04988

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Pump Station 5 - Wildwood
Renovation
Bidding
Augusta, ME 04330

Baxter Boulevard Pump Station Upgrades
Renovation
Results
Portland, ME 04103

Sanitary Sewer Pump Station Improvement
Results
Brunswick, ME

Littlejohn Pump Station Improvements
Results
Less than $556,000 est. value
Cape Elizabeth, ME 04107

Wastewater Treatment Facility and Pump Station Upgrades
Renovation
Results
Lincoln, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Last Updated 12/09/2020 09:29 AM
Project Title

Hospital Street Booster Station Upgrades

Physical Address View project details and contacts
City, State (County) Augusta, ME 04330   (Kennebec County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrading pumping systems and piping for a water booster station located at the intersection of Piggery Road and Hospital Street. The suction and discharge piping will be reconfigured to accommodate a more efficient design and pumping arrangement. 1. The contractor is responsible for completing all work as shown on the project drawings. 2. The Contractor will furnish and install all piping, fittings, valves, gaskets, hardware, adaptors and miscellaneous appurtenances not otherwise provided by the owner. 3. The Contractor will install the pumps and motors and the flow meter. 4. The Contractor is responsible for floor coring, pump pads, anchoring, concrete patching. 5. Maintain at least one pump operation at all times, unless a temporary shutdown coordinated with the Owner.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents