Similar Projects
Delaware County Junior Fair Building Upgrade
Post-Bid
$3,300,000 est. value
Delaware, OH

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Solon Parkside Elementary and Middle School HVAC Improvements Phase III
Results
$245,000 est. value
Solon, OH

Morehouse Pavilion AHU1 Replacement - Design-Build
Results
$1,216,000 est. value
Columbus, OH

Air Handler Replacements
Post-Bid
Less than $1,500,000 est. value
Dayton, OH

Wilmington High Rise Chiller Replacement
Results
Dayton, OH 45390

Design / Installation - Vehicle Exhaust Removal Systems at Two Fire Stations
Post-Bid
Monroe, OH 45050

Health Department Building Replacement of Package HVAC Unit and Controlling System
Results
Sidney, OH

Exterior Envelope Repairs and HVAC Upgrades of Building 1 at the Cincinnati Job Corps Center, Cincinnati, Ohio
Post-Bid
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45214

HVAC Unit(s) Installation at Family Support Center 2018.
Results
Batavia, OH

HVAC Rooftop Unit Replacement at Neighborhood Ministries - Rockford Village
Post-Bid
Youngstown, OH

Cuyahoga County Justice Center Complex - CPDHQ Building HVAC System Renovation
Results
Less than $592,494 est. value
Cleveland, OH

Cincinnati VA Medical Center's: Aircuity Optinet System
Post-Bid
Cincinnati, OH 45220

HVAC Maintenance
Term Contract
Results
Springfield, OH

J--Aircuity Service Contract This Sources Sought is Issued to Identify Capable and Interested Vendors that have the Ability to Preform the Work in the PWS.
Post-Bid
Cincinnati, OH 45220

Last Updated 12/10/2018 04:27 PM
Project Title

Construction Manager at Risk Services - Dunbar Hall Air Conditioning

Physical Address View project details and contacts
City, State (County) Kent, OH 44240   (Portage County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Dunbar Hall was constructed in 1959. Over the past ten years, Residence Services has invested funds to address critical safety needs such as fire alarm, fire door, power systems and room security improvements as well as invested in major shower and toilet room improvements, elevator replacements and accessibility enhancements. In 2015, Residence Services replaced the hot water hydronic system, installed vertical fan coil units and made student room improvements. At that time, there was no plan to extend chilled water infrastructure to the building. This project will extend chilled water to the building, run chilled water piping throughout the building, and replace 2-pipe Vertical Fan Coil Units with 4-pipe Vertical Fan Coil Units. Finish work will be limited to patching/repairing adjacent construction. All work is planned for summer 2019. All rooms must be completed and ready for occupancy by August 2, 2019.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents