Similar Projects
Meter Maintenance
Post-Bid
Clinton Township, MI

Catch Basin Cleanout
Post-Bid
Reed City, MI 49677

2018 Phase V Service Line Replacement
Results
Flint, MI

Bedford SRF Manholes and Sewer Improvements
Results
Less than $1,750,000 est. value
Monroe, MI

Sanitary Sewer Rehabilitation Project
Construction
Less than $200,000 est. value
South Rockwood, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Sanitary Sewer Repairs
Results
Less than $60,000 est. value
Wyandotte, MI

Contracting Services to Provide Complete Cross Connection Control Program
Post-Bid
MI

Lakewood Boulevard Water Main Replacement River Avenue To Beeline Road
Results
Less than $1,465,569 est. value
Holland, MI

Walnut Lake 1 Force Main Extension Project
Post-Bid
Pontiac, MI

Catch Basin Clean Out
Results
Hillsdale, MI

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Royal Oak Township Sanitary Sewer Rehabilitation
Results
Less than $378,574 est. value
Royal Oak, MI

Last Updated 09/14/2020 07:59 AM
Project Title

Wastewater and Water System Improvements Peck Street: Laketon to Merrill

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49440   (Muskegon County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,481,438
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

4,500 FT of 8 inch to 10 inch sanitary sewer, 1,550 FT of 12 inch to 36 inch storm sewer, 4,550 FT of 4 inch to 16 inch water main, 4,000 FT of road reconstruction. Including all necessary appurtenances and restoration.The project consists of furnishing all material and constructing the following approximate quantities: 1.4,500 ft. of 8-inch to 10-inch sanitary sewer 2.1,550 ft. of 12-inch to 36-inch storm sewer 3.4,550 ft. of 4-inch to 16-inch water main 4.4,000 ft. of road reconstruction

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents