Similar Projects
Ellis Crossing Apartments
New Construction
Conception
Durham, NC 27703

Fayette Place Redevelopment
New Construction
Conception
Durham, NC 27700

Alexan Glenwood South
New Construction
Design
Raleigh, NC

Sherron Road Residential
New Construction
Design
$24,000,000 est. value
Durham, NC 27703

Bragtown Street Improvements
Infrastructure
Bidding
$600,000 est. value
Durham, NC

Gateway Center
New Construction - 109,002 SF
Post-Bid
Durham, NC

Elizabeth Street Apartments
Renovation
Post-Bid
Durham, NC

Bradford Circle Drainage Improvements Project
Results
$480,000 to $600,000 est. value
Durham, NC

Pavement Preservation 2021
Results
Durham, NC

Willard Street Apartments
New Construction - 166,902 SF
Construction
$16,500,000 est. value
Durham, NC 27701

City Port
New Construction - 46,728 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Durham, NC 27701

Olive Branch Reserve
New Construction
Pending Verification
$132,000,000 est. value
Durham, NC 27703

Cedar Trace Apartments
New Construction
Conception
Durham, NC 28311

Holloway Studios
New Construction
Design
$6,500,000 est. value
Durham, NC 27701

American Tobacco Campus Mixed Use
New Construction - 703,000 SF
Post-Bid
$10,000,000 CJ est. value
Durham, NC

Reported 07/13/2022 11:51 AM
Project Title

East Geer Street Residential Development / Durham

Physical Address View project details and contacts
City, State (County) Durham, NC 27704   (Durham County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction
Contracting Method Bids by Invitation.
Project Status Obtained from a News Source, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $34,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Total sq ft for project not available at this time. Site work, paving and new construction of a mixed-use development in Durham, North Carolina. Working plans call for the construction of a 90-unit multi-residential development; for site work for a road / highway; and for paving for a road / highway. The scope of this project includes, but is not limited to, the following: site work, paving and new construction of an 84-90 unit multi-residential development. As of July 12, 2022, this project is in the early planning stages, and is pending annexation and zoning map change approvals from the City of Durham. A general contractor has been selected. A firm timeline has not been announced, however, construction is unlikely to begin prior to third quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction, 90 Unit(s).
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents