Similar Projects
Bridges and Box Culvert Renovations at Wind Cave National Park
Design
$250,000 to $500,000 est. value
Hot Springs, SD

Milbank West 7th Avenue Reconstruction
Bidding
$400,000 to $500,000 est. value
Milbank, SD 57252

Pavement Improvements
Bidding
$377,000 est. value
Kranzburg, SD

3/4 Inch Surfacing Gravel
Post-Bid
Huron, SD

SD NPS Pp 2020(1), Pavement Preservation South
Post-Bid
SD

I-29 Exit 73 Interchange Improvement
Results
Less than $800,000 est. value
Tea, SD 57064

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

Street Chip Seal-Prairie View
Bidding
Box Elder, SD

West Ash Avenue CIPP - 2020
Post-Bid
Loomis, SD 57301

Union County Road 1B Asphalt Concrete Overlay
Results
$2,774,569 est. value
Elk Point, SD

Bad Lands Mill Asphalt & Apply Hot Mix NE Entrance
Bidding
SD 57750

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2021 Scheduled Street Repairs
Renovation
Results
$230,225 to $250,000 est. value
Spearfish, SD

Lawrence Street Rehabilitation - Phase I
Bidding
Belle Fourche, SD 57717

Pavement Rehabilitation Project - Rand Road
Post-Bid
Rapid City, SD 57702

Last Updated 03/11/2021 02:03 PM
Project Title

Chip Sealing and Fog Sealing Bid

Physical Address View project details and contacts
City, State (County) SD   (Yankton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

58.75 miles more or less. Successful bidder to supply MC3000 oil & 3/8” washed quartzite chips, all equipment, brooms, signs, and flagmen to complete the chip sealing of 58.75 miles in Yankton County. Road will be sealed from grass edge to grass edge on roads. Outside temperature must be at least 65 degrees above zero each day before contractor can begin sealing. 58.75 miles more or less. Contractor to furnish CSS-1h oil. The fog seal shall be placed within five (5) days of the completion of the chip seal. Prior to the application of the fog seal, the Contractor will be required to broom the chip seal. A CSS-1h emulsion shall be used for the fog seal application.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents