Similar Projects
Abutment, Berm, Joint Repair, Approach Slabs, Bridge Ends and Approach Pavement
Infrastructure
Conception
$683,000 CJ est. value
Oelrichs, SD 57763

Abutment, Berm, Joint Repair, Approach Slabs, Bridge Ends and Approach Pavement
Infrastructure
Conception
$683,000 CJ est. value
Oelrichs, SD 57763

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

601 Fourth Avenue Demolition, Debris Removal, and Site Restoration
Infrastructure
Post-Bid
Edgemont, SD 57735

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bridges and Box Culvert Renovations at Wind Cave National Park
Results
$250,000 to $500,000 est. value
Hot Springs, SD

2000 Tons - Asphalt Millings
Infrastructure
Post-Bid
$400,000 est. value
Edgemont, SD

Nebraska National Forests- Fall River Road Maintenance
Infrastructure, Alteration
Results
Hot Springs, SD

High School CTE and Lab Facility
New Construction, Infrastructure - 18,300 SF
Post-Bid
$5,800,000 CJ est. value
Hot Springs, SD 57747

Rout and Seal
Infrastructure
Results

Asphalt Concrete Repairs and Asphalt Surface Treatment
Infrastructure
Results

2022 FRC Asphalt Surface Treatment
Infrastructure
Results
$1,000,000 est. value
Hot Springs, SD

Pavement Foam Jacking at various locations
Infrastructure
Results
$300,000 est. value

Hot Springs Facility Parking Lot and Driveway Improvements Project
Infrastructure
Results
$500,000 CJ est. value
Hot Springs, SD 57747

Last Updated 02/11/2023 05:05 AM
Project Title

Polymer Chip Seal

Physical Address View project details and contacts
City, State (County) Hot Springs, SD 57747   (Fall River County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $264,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US18 W - 6 N of US358 S over Horsehead Ck Length 0.0 As of February 11, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Polymer Chip Seal *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents