Similar Projects
Ambrosia Treatment Center - Phases I and II
Addition - 17,880 SF
Construction
Medford, NJ 08055

Advanced Recovery Center
New Construction - 31,429 SF
Construction
$27,000,000 est. value
Cherry Hill, NJ 08002

Hammonton Rehabilitation Center
New Construction, Renovation - 35,000 SF
Construction
Hammonton, NJ 08037

Daytop Residence Hall Renovations
Renovation
Construction
$242,000 est. value
Pittsgrove, NJ

Nursing and Rehabilitation Center
Renovation - 81,000 SF
Construction
$7,955,600 est. value
East Hanover, NJ 07936

Spring Grove Rehabilitation & Healthcare Center
Renovation, Addition - 5,330 SF
Design
New Providence, NJ 07974

The Gardens at Monroe
New Construction, Demolition - 258,471 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Jamesburg, NJ 08831

Nursing Home Addition
Addition
Design
Paramus, NJ 07652

Parker at McCarric Expansion
Addition - 25,526 SF
Design
East Millstone, NJ 08873

Arden Courts of Wayne
Renovation - 10,500 SF
Construction
Wayne, NJ 07470

Stonebridge at Montgomery
Addition - 1,645 SF
Pending Verification
Montgomery Township, NJ 08558

Last Updated 10/29/2019 02:55 PM
Project Title

Renovations to the Waldwick Senior Center

Physical Address View project details and contacts
City, State (County) Waldwick, NJ   (Bergen County)
Category(s) Medical
Sub-Category(s) Nursing/Rehabilitation Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work to be performed under this contract includes the following: Base Bid: Renovations to the Waldwick Senior Center as shown and specified. Alternate 1: Kitchen Renovations as described on Drawing A-100 and notes and details on other drawings. Alternate 2: New solid wood doors and frames for Men`s Room, Women`s Room, and Kitchen as described on Drawing A-101 and notes and details on other drawings. (Note new access hardware for these doors is part of the base bid). Alternate 3: Construct new built in cabinetry in window alcove as described on Drawing A-101 and notes and details on other drawings. (Note new solid plastic sill is part of the base bid). Alternate 4: Provide new cabinetry and solid plastic counter at locations indicated on drawings. (Note solid plastic counter is part of Alternate 4 price). Alternate 5: Provide new window blinds for all windows as specified on Drawing A-101 and specified herein. Alternate 6: Remove existing electrical receptacles and light switches throughout Community Room and provide new electrical receptacles and switches.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents