Similar Projects
SH0044 - Flexible Base
Bidding
$210,000 est. value
TX

Brawner Parkway - Carroll Lane to Kostoryz Road (Bond 2018)
Bidding
Corpus Christi, TX 78473

Roadway Rehabilitation Projects CR 67, CR, 69, CR 77 and Bauer Road
Post-Bid
TX

Roadway Rehabilitation Projects
Post-Bid
Corpus Christi, TX 78401

Southern Region Disaster Recovery Support BPA
Results

Park Road 22 Bridge Bond 2004 (Re-Bid)
Results
Less than $12,580,000 est. value
Corpus Christi, TX 78469

Paving/Concrete
Term Contract
Bidding
Corpus Christi, TX

Roadway Rehabilitation Projects - County Road 22 and County Road 49, Project
Post-Bid
Corpus Christi, TX 78415

North Padre Island Beach Access Road - Newport Pass Rd and Zahn Rd (Bond 2014) H17013
Results
Corpus Christi, TX 78401

Concrete Paving at Wiggins Cottages
Post-Bid
Corpus Christi, TX

FY2020 Crack Seal CC Area Office
Results
Less than $132,260 est. value
TX

Mill and Fill
Results
Less than $250,699 est. value
TX

Mill and Inlay
Results
Less than $2,654,189 est. value
TX

Pavement Repair and Planing
Results
Less than $965,206 est. value
TX

Add Left Turn Lane and Safety Treat Fixed Objects
Results
Less than $140,723 est. value
TX

Last Updated 11/20/2019 08:34 AM
Project Title

Street Preventative Maintenance Program (Spmp) FY 2019 - 18135A

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Street Preventative Maintenance Program (SPMP) FY 2019 will provide city-wide road maintenance consisting primarily of mill and overlay to arterial, collector and residential streets as well as ultra-thin bonded wear course construction to arterial and collector streets. The project is an indefinite delivery/ indefinite quantity contract that will require the Contractor to perform a variety of tasks associated with roadway maintenance. General requirements of the contract include traffic control and pavement markings. Street improvement construction includes subgrade and base repair, pavement milling, installing hot mix asphaltic concrete and installing ultra-thin bonded wear course. Minor utility improvements such as wastewater and storm water manhole ring and cover adjustment, water valve cover adjustment and gas valve cover adjustment will also be required as part of the program. Concrete activities such as curb and gutter, sidewalk and driveway installation are also included in the program scope. The work will be issued in individual work orders called “Delivery Orders” that provide specific scope and requirements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents