Similar Projects
U Of C Arts Lawn Phase 2
Alteration - 40,700 SF
Design
Chicago, IL 60637

I-21-4741 Utility Relocation Under Union Pacific Railroad
Infrastructure
Bidding
Franklin Park, IL

Water System Separation
Infrastructure
Bidding
Des Plaines, IL 60017

Drainage Engineering Services
Term Contract
Post-Bid
IL

Removal of Trees, Overgrown Vegetation and Other Debris on 13 Residential Lots
Post-Bid
Park Forest, IL 60466

2020 Water Main Improvement
Results
Glencoe, IL 60022

Water Main Improvements
Results
Less than $1,500,000 est. value
Mount Prospect, IL 60056

Palatine Strip Mall Facade & Sewer Improvements
Renovation, Alteration
Pending Verification
Palatine, IL 60067

Tree and Vegetation Removal
Alteration
Bidding
Park Forest, IL 60466

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

2020 Water Main Replacement
Results
Franklin Park, IL 60131

Relocation of Taxiways A & B - TP-29 - Snow Staging Area Relocation
Infrastructure
Bidding
Less than $3,000,000 est. value
Chicago, IL 60666

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

2020 Airfield Pavement Repairs
Results
Wheeling, IL 60090

Bulk Fertilizer Applications and Turf Products
Term Contract
Bidding
Arlington Heights, IL

Reported 01/07/2022 12:00 AM
Project Title

Relocation of Taxiways A & B - TP-25 - Trunk Sewer and Related Infrastructure

Physical Address View project details and contacts
City, State (County) Chicago, IL 60666   (Cook County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Runways/Taxiways, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Agent (CMa)
Owner View project details and contacts
Architect View project details and contacts
Description

Includes and is not limited to the installation of approximately 2,300 LF of 144” Reinforced Concrete Pipe (RCP) - Jacked and Bored, as well as installation of approximately 150 LF of 54” RCP. Scope includes the installation of junction chambers, risers, frames, grates, and lids, pavement demolition, erosion control measures, site restoration, and contractor quality control as required in contract documents. Project restrictions include working on the active Air Operations Area (AOA) and night work in proximity to active taxiways and runways. All work activities will be closely coordinated with the CMR and Airport Operations.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents