Similar Projects
New Frontier Bank / Lake Saint Louis
New Construction, Infrastructure - 3,042 SF
Conception
$800,000 CJ est. value
Lake Saint Louis, MO 63367

Lowe's Tool Rental Expansion
Addition, Demolition, Infrastructure - 3,196 SF
Design
$1,200,000 CJ est. value
Saint Charles, MO 63301

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

RFQ Engineering - Main Street - Phase III
Infrastructure
Bidding
$2,400,000 CJ est. value
Cottleville, MO 63366

RFQ Engineering - Main Street - Phase III
Infrastructure
Bidding
$2,400,000 CJ est. value
Cottleville, MO 63366

Chicken N Pickle - Package 2
New Construction, Infrastructure - 24,162 SF
Post-Bid
$5,000,000 CJ est. value
Saint Charles, MO 63303

St. Charles County Regional Airport - Construct Taxilanes
Infrastructure
Post-Bid
$75,000 CJ est. value
Portage des Sioux, MO 63373

Storm Water Crossing Box Culvert at St.Peters Golf Club
Infrastructure
Results
$99,138 CJ est. value
Saint Peters, MO 63376

Central School Road and St. Peters- Howell Road Traffic Flow Improvements
Infrastructure
Results
Saint Peters, MO 63376

Technology Drive / Multi-Residential
New Construction, Infrastructure
Construction
$54,000,000 CJ est. value
Lake Saint Louis, MO 63367

Homebank
New Construction, Infrastructure - 4,565 SF
Construction
$3,000,000 CJ est. value
Cottleville, MO 63366

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

Project Flywheel Premier 370 Business Park Plat Four Lot 25A and 25B
New Construction, Infrastructure - 1,200,000 SF
Pending Verification
$129,000,000 CJ est. value
Saint Peters, MO 63376

Idle Storage and Condominium Development
New Construction, Infrastructure - 112,140 SF
Design
$14,000,000 CJ est. value
Saint Peters, MO 63376

Peter Street Road Improvements
Infrastructure
Post-Bid
$115,000 est. value
New Melle, MO 63365

Last Updated 10/18/2023 06:36 AM
Project Title

Resurface - Route I-70

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63303   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6S3486 Route M ST CHARLES County. Resurface from north of Route P to Route 79, the total length of improvement being 0.852 miles. (2): Job J6S3667 Route I-70 S.O.R. ST CHARLES County. Resurface from Route 370 interchange to Cave Springs Road, the total length of improvement being 1.062 miles. Range: $750K to $1M 0011540 Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. DBE Goal Percent: : 12.00 Contract Time: 11/1/24 MO DOT- F04 - Resurface - Route I-70 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents