Similar Projects
Lift Station Engineering Rehab/Replacement - City of St. Petersburg
Renovation
Conception
$2,800,000 CJ est. value
Elwyn, PA 19063

Influent Wet Well Rehabilitation - City of St. Petersburg
Infrastructure
Conception
$450,000 CJ est. value
Elwyn, PA 19063

RFQ D/B - Emergency Generator for Bernville Protective Works Pump Station
Renovation
Bidding
$5,000,000 CJ est. value
Bernville, PA 19506

Lehigh Pump Station Project
Renovation
Bidding
$320,000 CJ est. value
Mountain Top, PA 18707

T-28 Construction and PS-5 Modifications
Renovation
Post-Bid
Chester, PA

Lift Station
Alteration
Post-Bid
New Castle, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

Pump Station Monitoring Installation
Results
McClellandtown, PA

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main
Addition, Demolition, Renovation, Infrastructure
Construction
$2,071,083 CJ est. value
Elizabethtown, PA 17022

Sod Farm Slurry Wall - 003363A - Pinellas County
Renovation, Infrastructure
Conception
$12,000,000 CJ est. value
Elwyn, PA 19063

Swedesburg Pump Station Upgrade - Contract One - General Construction and Contract Two - Electrical
New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
King of Prussia, PA 19406

Cardiff Pump Station Abandonment and Utility
New Construction, Infrastructure
Post-Bid
Nanty Glo, PA

Pump Station Grinder Upgrades Contract
Infrastructure
Results
$260,000 est. value
Buckingham, PA

Booster Station and Waterline Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Wingate, PA 16823

Last Updated 01/23/2023 01:09 PM
Project Title

Oak Park Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Pine Township, PA 15090   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $639,357 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be completed under two separate contracts: Contract One: General Construction and Contract Two: Electrical. The work involves the demolition and replacement of the existing pump station building and appurtenances, relocation of generator and control panel for temporary operation of pump station, replacing old fence, and repaving access road and surrounding area for the pump station. Each Bid shall be accompanied by a Certified Bank Check or Bid Bond, in the required form as stated in the Project Manual, in an amount not less than five percent (5%) of the Bid Total. The Authority reserves the right, at its option, to waive any informalities, defects, errors or omissions in any or all Bids and to reject any or all Bid Results: CONTRACT NO. 1: GENERAL CONSTRUCTION Thomas Construction, Inc. $595,964 CONTRACT NO. 2: ELECTRICAL CONSTRUCTION Wagner Electric and Construction, LLC $43,393.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents