Similar Projects
South Phoenix Chabad Center
Conception
$500,000 est. value
Phoenix, AZ

Cottonwood Christian Assembly Phase II
New Construction, Renovation
Conception
Cottonwood, AZ 86326

Cross of Glory School Addition
Addition
Design
Peoria, AZ 85383

Cottonwood Christian Assembly Phase I
New Construction, Addition - 16,400 SF
Design
Cottonwood, AZ 86326

Construction Manager at Risk - C.O. Greenfield Campus
New Construction, Term Contract
Bidding
Less than $15,000,000 est. value
Phoenix, AZ 85042

Job Order Contracting
Renovation
Bidding
Tempe, AZ

Replacement of Lukachukai Community School
New Construction - 104,024 SF
Post-Bid
Less than $58,000,000 est. value
Lukachukai, AZ 86507

Truss Repair and Classroom Restoration
Post-Bid
Hereford, AZ 85615

Carrillo Elementary School Weatherization
Results
Tucson, AZ 85701

CMAR Desert Mountain Elementary Addition
Addition - 8,000 SF
Results
$1,500,000 est. value
Queen Creek, AZ 85142

Shirdi Saibaba Temple
New Construction - 18,181 SF
Construction
$1,981,729 est. value
Phoenix, AZ 85023

Harvest Church
New Construction - 49,075 SF
Construction
Peoria, AZ 85345

Weatherization Project - Lagos
Bidding
Phoenix, AZ 85048

Construction Manager at Risk - Elementary School No. 32
Post-Bid
Phoenix, AZ 85083

Level Existing Weight Room Building & Rebuild A New Building
Renovation
Results
Less than $2,139,450 est. value
Chandler, AZ 85224

Reported 04/20/2021 05:14 PM
Project Title

Our Lady of Grace Church and School Phase 2

Physical Address View project details and contacts
City, State (County) Maricopa, AZ 85138   (Pinal County)
Category(s) Education, Religious/Funeral
Sub-Category(s) Elementary School, Religious Facility
Contracting Method Bids by Invitation.
Project Status Delayed due to COVID-19
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1,000-Seat Church Expansion & New School

Details

Religious Facility, New Construction, Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents