Similar Projects
Cape Girardeau Readiness Control - Install Roof Mounted Solar Panel Array and LED Lighting, FMS Building
Renovation
Design
Cape Girardeau, MO 63701

Generator Maintenance and Repairs
Term Contract
Design
$90,000 CJ est. value
Springfield, MO 65806

Central Plant and Energy Distribution Systems
Alteration
Post-Bid
Maryville, MO

Replace the Buildings Generator
Alteration
Post-Bid
Hannibal, MO

Electric Motor Repairs
Term Contract, Alteration
Results
Gretna, MO

Phase 4 Distribution System Improvements
Renovation, Infrastructure, Alteration
Results
Kahoka, MO

Lighting / Installation for Baseball / Softball Fields
Infrastructure
Design
$300,000 CJ est. value
Scott City, MO 63780

Lighting, Materials Only
Alteration
Post-Bid
Florissant, MO

Radial Feeder Electrical Upgrades
Alteration
Results
Maryville, MO 64468

Electrical Work
Renovation
Design
$80,000 CJ est. value
Sedalia, MO 65301

HVAC Replacement and Electrical Upgrade Project at Innovation School at Cool Valley
Alteration
Post-Bid
$800,000 est. value
Beverly Hills, MO 63121

Dark Fiber Network Installation
Term Contract
Results
O Fallon, MO 63366

Big Bend Signal Improvements
Infrastructure
Design
$800,000 CJ est. value
Saint Louis, MO 63103

City Hall Generator Replacement
Alteration
Post-Bid
$200,000 est. value
Glendale, MO

Intramural Fields Lighting Replacement
Infrastructure
Results
$271,893 CJ est. value
Rolla, MO 65401

Last Updated 09/12/2023 03:48 PM
Project Title

Courthouse Electrical Repairs and Wiring 2023

Physical Address View project details and contacts
City, State (County) Hillsboro, MO 63050   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County is seeking request for proposals to add data cabling in 12 courtrooms and the law library. On average each room will be adding 4 drops for around 50 total drops. The majority of the courtrooms have tongue and groove tiles, some of the tiles have already been removed to gain access above to run new cable. Plastic cable raceway is installed for the current cable but may need to be replaced for the additional drops in each room. The switch in Division 14(basement) will need to be moved out of the courtroom and installed in a floor rack in the county Information Technology Server closet. Rack space must be clearly identified as "OSCA". A patch panel and horizontal cable management will also need to be installed. The ground floor rack and 1st floor rack are in good shape to accept additional cabling. The 2nd floor closet where the rack is housed will need a new wall rack next to the existing rack and adding the additional drops and network gear in the new rack.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents