Similar Projects
Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Design
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

Peoria and LaGrange Dams Composite Wicket Gates
Post-Bid
Peoria, IL

Lakeside Tunnel Isolation at Dallman Power Station
Renovation
Results
Springfield, IL 62701

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

McKinley Woods Preserve Bridge Over the I and M Canal Improvements
Results
Less than $170,000 est. value
Channahon, IL 60410

Olmsted Lock and Dam Final Site Restoration
Design
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Crab Orchard NWR Devils Kitchen Dam Aux Splway
Results
$500,000 to $1,000,000 est. value
Marion, IL

Olmsted Pole Barn 1 & 2 Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Hammel Woods Dam Modification
Results
Shorewood, IL 60431

Crab Orchard Dam Spillway Concrete Repairs
Design
$1,000,000 to $5,000,000 est. value
IL

Last Updated 03/26/2021 09:44 AM
Project Title

Dike & Revetment - USACE St. Louis District

Physical Address View project details and contacts
City, State (County) Cairo, IL   (Alexander County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers (USACE), St. Louis District, is seeking businesses that are interested in and capable of performing dike and revetment services located on the Mississippi River Miles 300.0 – 0.0; approximately LaGrange, MO to Cairo, IL. The anticipated work would be within the geographic boundaries of the Mississippi Valley Division (MVD) and Region 4. The anticipated contract type will be Firm Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ), Single Award Task Order Contract (SATOC) with a base year and four (4) option years. Areas of work involving characteristics that are similar to the types of work described herein: • River-based river training structure • Construction on an active navigation channel • Placing Graded Stone A (5,000-pound top size sone) • Dike degradation • Recycling stone • Verification surveys in Reach Mississippi River Miles (RMR) 300.0 – 0.0 • Developing quality assurance project plans

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents