Similar Projects
Dove Ridge Subdivision
Conception
Sioux Falls, SD 57103

Nielson Apartment Complex
New Construction - 95,592 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Sioux Falls, SD 57105

Porter's Eagle Ridge Estates
Design
Harrisburg, SD

Murphy Ranch Estates Subdivision: Track A-F
New Construction
Design
Rapid City, SD 57703

Lennox 4-H Site Grading Improvements
Infrastructure
Bidding
$125,000 est. value
SD

Airport Improvements
New Construction
Post-Bid
Hot Springs, SD 57747

Miller Ranch Subdivision Phase 1
Post-Bid
Spearfish, SD 57783

2018 Improvement - Pipeline
Results
$3,500,000 est. value
Beresford, SD 57004

D & I Railroad Mainline and Crossing Improvements
New Construction, Alteration
Results
Brookings, SD

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Two-Sheet Ice Arena
New Construction
Pending Verification
$14,000,000 est. value
Watertown, SD

Three Building Expansion To Cherapa Place
New Construction
Pending Verification
$160,000,000 est. value
Sioux Falls, SD 57103

Sky Ridge Mixed Use
New Construction
Design
Spearfish, SD 57783

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Reported 08/14/2021 12:00 AM
Project Title

25-Bed Adult Detention Center Design-Build and Construction Administration Services

Physical Address View project details and contacts
City, State (County) Agency Village, SD   (Roberts County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Misc. Recreational, Prison/Jail, Site Development
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

25-Bed Detention Center. Site Work - Site improvements including but not limited to utilities, pavement, landscaping, dirt work required, etc. Building Construction - Construction of a 12,800 sf detention center which including but not limited to Administrative/Support space, inmate processing, laundry, Food Services, Housing Control, Male and Female Housing, Indoor Recreation Area, Male and Female Outdoor Recreation Area, etc. Construction Administration - including but not limited to Periodic observation, Shop Drawings review, testing and inspection review, monthly pay request review, change requests, assist in resolving claims, establish substantial completion, coordinate Occupancy with Authorities Having Jurisdiction, review real property costs data, provide final building and site data, review final as-built drawings attend one year warranty inspection

Details

Prison/Jail, 12,800 SF New Construction, Building.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents