Similar Projects
Randy Owen Performance Center - Jacksonville State University
New Construction, Infrastructure - 60,000 SF
Conception
$15,000,000 CJ est. value
Jacksonville, AL 36265

Randy Owen Performance Center - Jacksonville State University
New Construction, Infrastructure - 60,000 SF
Conception
$15,000,000 CJ est. value
Jacksonville, AL 36265

Paving, concrete work and construction requirements in Anniston, Alabama
Infrastructure
Design
$10,000,000 est. value
Anniston, AL

Sacred Heart of Jesus Catholic Church Gym Addition
Addition, Infrastructure
Design
$3,000,000 CJ est. value
Anniston, AL 36207

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Leighton Avenue Resurfacing Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Anniston, AL 36201

Demolition and Site Work at Oxford High School
Demolition, Infrastructure
Post-Bid
Oxford, AL 36203

Widening and Drainage Improvements along Mountain St NE
Infrastructure
Post-Bid
$210,000 CJ est. value
Jacksonville, AL 36265

Planing, Resurface, and Traffic Stripe on a Portion of Mudd Street in Calhoun County
Infrastructure
Results
AL

Roadway and Sewer Improvements
Infrastructure
Results
Oxford, AL 36203

Bynum Cutoff Road Improvements - City of Oxford
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Oxford, AL 36260

Bynum Cutoff Road Improvements - City of Oxford
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Oxford, AL 36260

Planing, Resurface, and Traffic Stripe on Vigo Road
Infrastructure
Post-Bid
$300,000 CJ est. value
Piedmont, AL 36272

Bituminous Surface Treatment With CRS-2 Asphalt Emulsion
Infrastructure
Results
AL

Advance Responder Training Complex(ARTC) Building 640 Renovation
Renovation, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Anniston, AL 36201

Last Updated 12/09/2022 11:05 AM
Project Title

Indian Mountain (RTP) Trail Construction at the Forever Wild Indian Mountain Tract

Physical Address View project details and contacts
City, State (County) Piedmont, AL 36272   (Calhoun County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids must be accompanied by a certified check or bid bond in an amount not less than five percent (5%) of the contract bid price, but not to exceed Ten Thousand Dollars ($10,000). Also included with proposal at bid opening shall be an executed copy of the Disclosure Statement required by Act 2001-955 (Article 3B of Title 41, Code of Alabama 1975). No bids shall be accepted after the time stated for receipt of bids. Evaluation/Award: The award will be made to the responsible bidder quoting the lowest total cost to the Department. The Department reserves the right to compare specific items, at its discretion, to determine the lowest responsible bidder. It is anticipated that the award will be made within thirty (30) days of the bid opening.Performance Bond: A performance bond in the amount of 100% and a Payment Bond in the amount of 100% of the contract price will be required of the successful bidder. Laws / Ordinances: The Contractor shall observe and comply with all federal, state, and municipal laws, ordinances, rules, and regulations that would apply to this project. Open Trade: By submitting a bid, proposal, or qualification, the submitter represents that he/she and the business entity he/she represents is not currently engaged in the boycott of a person or entity based in or doing business with a jurisdiction with whom the State of Alabama can enjoy open trade, as defined in Act 2016-312. Immigration / E-Verify: In compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, as a condition for the award of any contract by the state to a business entity or employer that employs one or more employees, the business entity or employer shall provide documentation establishing that the business entity or employer is enrolled in the E- Verify program. The successful bidder will be required to acknowledge that it will not violate federal immigration law or knowingly employ, hire for employment or continue to employ an unauthorized alien within the State of Alabama. Non-Discrimination: The Department of Conservation and Natural Resources does not discriminate on the basis of race, color, religion, age, sex, pregnancy, national origin, genetic information, veteran status or disability in its hiring or employment practices nor in admission to, access to, or operations of its programs, services, or activities. Force Majeure: In the case of a Force Majeure Event as defined herein, DCNR reserves the right to immediately terminate the Agreement without prior notice to Concessionaire. Should this occur, neither Party shall be liable for or be considered in breach of this Agreement due to any failure to perform its obligations as a result of a cause beyond its control, including, without limitation: (i) acts of God; (ii) flood, fire or explosion; (iii) actions, embargoes, quarantines, or blockades in effect on or after the date of this Agreement; (iv) national, state, or regional emergency, whether ongoing or occurring on or after the date of this Agreement; (v) public health emergencies, outbreak, epidemic, or pandemic, whether ongoing or occurring on or after the date of this Agreement, including, without limitation, COVID-19; or (vi) any other event which is beyond the reasonable control of such party (each of the foregoing, a "Force Majeure Event"). General Information: For contracts in excess of $50,000, Contractor must be licensed as a General Contractor. Title 34, Chapter 8, Code of Alabama, 1975. The Department reserves the right to reject any or all bids or to waive any informalities in the bidding. All responses received will be subject to the Alabama Open Records Act, Ala. Code 36-12-40, (1975), as amended, and may be subject to public disclosure upon request. If Americans with Disabilities Act accommodations are needed to attend the bid opening or other required meetings or site visits, please contact John Mareska at (251) 861-2882. Requests should be made as soon as possible, but at least 72 hours prior to scheduled meetings or site visit. This publication is available in alternative formats upon request. Scope of Work: The work shall generally consist of construction of approximately 2.5 miles (1,320 +/- linear feet) of non-motorized, single, and natural surface hiking trail (dirt work, clearing, grubbing, disposal). All work shall be done under applicable State Laws.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents