Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Construction Management at Risk Services for AIS Capital Improvement (Juvenile and Pershing Upgrades)
Renovation
Bidding
Chicago, IL

Replacement Centralized Hot Water System
Alteration
Bidding
Saint Charles, IL

DHS/Elgin MHC Refrigeration
Term Contract
Post-Bid
Elgin, IL 60123

Water Heater Replacement - Tech Building
Post-Bid
Ford Heights, IL 60411

Physical Education Center Water Heater Replacement
Results
Glen Ellyn, IL 60137

Boiler 2 Segment Replacement at Henry Elementary School
Results
Chicago, IL 60618

Montessori School
Build-Out - 18,000 SF
Construction
Naperville, IL 60540

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Signal Engineering Professional Services
Alteration
Bidding
Chicago, IL 60661

Rebuild Filter Backwash System at Simeon High School
Post-Bid
Chicago, IL 60602

Domestic Hot Water System Replacement at Donoghue Elementary School
Results
Chicago, IL 60653

Mooseheart Activity Center
Addition
Construction
Mooseheart, IL 60539

CPS Depriest ES & Hay Academy
Renovation
Bidding
Chicago, IL 60644

2021 Swartz Elementary School Boiler Replacement
Post-Bid
Oakbrook Terrace, IL 60181

Last Updated 03/03/2022 04:16 PM
Project Title

Boiler Replacement at Multiple Schools

Physical Address View project details and contacts
City, State (County) Bartlett, Elgin, Streamwood, Wayne, IL 60120 (Cook, DuPage, Kane Counties)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000 to $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid 1: BOILER REPLACEMENT AT COLEMAN ES (PROJECT NO. 684)-cost estimate: $40,000 - Base Bid 2: HERITAGE ES (PROJECT NO. 877)-cost estimate: $40,000 - Base Bid 3: INDEPENDENCE CENTER FOR EARLY LEARNING (PROJECT NO. 1052)-cost estimate: $35,000 - Base Bid 4: RONALD O'NEAL ES (PROJECT NO. 1402)-cost estimate: $45,000 - Base Bid 5: WAYNE ES (PROJECT NO. 1552)-cost estimate: $40,000. In this project, the work includes the replacement of existing boiler and all associated work at the above listed schools.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping, Joint Sealants.
Division 09 - Finishes, Painting, Interior Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications, Communications Horizontal Cabling.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents