Similar Projects
Runway 24 Obstruction Removal
Infrastructure
Bidding
$300,000 est. value
Clinton, NC 28328

Raleigh-Durham International Airport (RDU) Runway 5L-23R Pavement Preservation
Infrastructure
Sub-Bidding
$5,000,000 est. value
NC

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Repair Airfield/Base Pavements at Seymour Johnson AFB, NC.
Results
$3,000 to $35,000,000 est. value
Goldsboro, NC 27531

Taxiway B Rehabilitation-Phase 2
Results
$10,000,000 to $20,000,000 est. value
Morrisville, NC 27560

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

Runway 4 Approach Clearing
Results
New Bern, NC 28562

Install Runway 23R ILS Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

North Aircraft Apron Pavement Rehabilitation
Results
Currituck, NC

Harnett Regional Jetport Apron Expansion
Infrastructure
Post-Bid
Erwin, NC 28339

West Apron Expansion - Phase II
Results
Oak Island, NC

Repair Concrete at High Power Run Up Pit (HPRU) 4042
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Taxiway F Extension, Deicing Pad, South Crossfield Taxiway and Yorkmont Road Realignment Project - Package 3
Results
Charlotte, NC

Taxiway Alpha Rehabilitation
Infrastructure
Post-Bid
Richlands, NC 28574

Reported 04/20/2022 12:00 AM
Project Title

Runway 5L-23R Replacement

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27603   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $250,000,000 to $350,000,000
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk Services for The Program involves the replacement of existing Runway 5L-23R with a similar runway parallel to the existing, and approximately 535’ to the northwest. Also included in the Program are the following major items of work: 1) Demolition of existing Runway 5L-23R and construction of a parallel taxiway in its location; and 2) Relocation of a portion of Lumley Road.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents