Similar Projects
2022 Southweat 24th Street, Southweat 28th Street, and Southweat Faith Court Reconstruction and Utility Repairs
Infrastructure
Bidding
$300,000 est. value
Troutdale, OR

US 30 MP 14.11-14.28 Pavement Repair
Infrastructure
Bidding
$200,000 est. value
Portland, OR 97239

NW 9th - NW Hoyt Street System Improvements - CM/GC
Infrastructure
Post-Bid
OR 97209

I-84: I-205 - Marine Drive Section of the Columbia River Highway
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
OR

I-84: Multnomah Falls - Toothrock Tunnel - Cascade Locks
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
OR

Cornelius Pass Road Arterial Corridor Management Project On The Cornelius Pass Highway (RT. No. OR127) Near Portland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

I-5: Miley Road OR-551 Ramps
Infrastructure
Bidding
$90,000 est. value
Portland, OR

99E MP - 4.48 to 4.86 Pavement Repair
Infrastructure
Post-Bid
Portland, OR 97239

2022 Street Surfacing
Infrastructure
Results
$5,500,000 est. value
Gresham, OR

I-5 Rose Quarter Project - Early Work Package B - Right of Way Development
Infrastructure
Post-Bid
Portland, OR 97227

Errol Heights
Infrastructure
Results
$5,991,000 est. value
Portland, OR 34997

2022 Pavement Preservation Project
Infrastructure
Post-Bid
$500,000 est. value
Portland, OR

US30 MP 1.97 Pavement Repair
Infrastructure
Results
$300,000 est. value
Portland, OR 97239

Sunnyside South and Ladd's Reconstruction and Green Streets (ALD-06 and ALD-07)
Infrastructure
Results
$4,668,000 est. value
Portland, OR

Hoonah Road Maintenance
Infrastructure
Results
Portland, OR

Last Updated 06/21/2022 06:57 AM
Project Title

Stark and Buckman East Reconstruction and Green Streets

Physical Address View project details and contacts
City, State (County) Portland, OR   (Multnomah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Stark and Buckman East Reconstruction and Green Streets (HSS-17) involves the construction of combination sewer and street improvements including water quality facility basins, and potable water main, water service, and hydrant work, between SE Hawthorne St and NE Everett St., from SE 14th Ave to SE 32th Ave. Class 8, Sewer Construction for $20,000,000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents