Similar Projects
1300 East; Waynes World to Nashi Lane - Draper Reconstruct and Widening
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Draper, UT 84020

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Juniper Canyon Recreation Area (JCRA) Eastern Trailhead
Infrastructure
Post-Bid
Herriman, UT

Reclamation Construction for Overland 2 Project
Results
Less than $350,000 est. value
Salt Lake City, UT

Delong Street And Parks and Public Lands Storage Yard Improvements
Results
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Costco
New Construction
Construction
Riverton, UT 84065

Rocky Ridge Park Site Improvement Project
Term Contract
Post-Bid
$850,000 est. value
West Valley City, UT 84118

Site Improvements at Taylorsville High School for Relocatable Classroom Buildings
Infrastructure
Results
Taylorsville, UT 84123

Grandville Phase 1 And Phase 2 Infrastructure Project
Infrastructure
Post-Bid
South Jordan, UT 84009

Blakes Lambing Ground Guzzler Excavation
Infrastructure
Results
Salt Lake City, UT

Government Center Campus Reconstruction and Site Development
Renovation, Infrastructure
Post-Bid
Salt Lake City, UT 84115

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Monroc Well and Reservoir 4 Site Improvements Project
Infrastructure
Post-Bid
Cottonwood Heights, UT 84121

Salt Lake International Airport Ga Zone 3 Corporate Hangar Site Development
Infrastructure
Results
$1,213,237 est. value
Salt Lake City, UT

Last Updated 05/16/2022 07:56 AM
Project Title

Herriman Main Street Park Strip Project

Physical Address View project details and contacts
City, State (County) Herriman, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to: clearing and grubbing, rough and finish grading, utilities, i.e., water meter, electrical power service, conduit and lines, site lighting, running wire and connecting bridge existing (4) light poles, concrete flatwork, asphalt trail, irrigation point of connection, irrigation system, BioNative areas, trees and plantings, and other items per the plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Irrigation Pumps.
Division 33 - Utilities, Water Utility Distribution Equipment, Water Utility Metering.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents