Similar Projects
Roofing, Roof Accessories and Roofing Design
Alteration
Design
$500,000 to $2,000,000 est. value
Robins Air Force Base, GA

Roof Replacement at the Jail, Fleet Management and Health Department
Renovation
Design
$1,668,840 CJ est. value
Athens, GA 30601

Dacula Library Roof Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Dacula, GA 30019

Commerce Service Center - Roof Replacement
Renovation
Sub-Bidding
$825,000 CJ est. value
Jefferson, GA 30549

Metal Panel Wall Installation
Alteration
Post-Bid
$200,000 est. value
Newnan, GA 30265

Yamacraw Village Community Building Reroof and Repair
Alteration
Post-Bid
Savannah, GA 31401

Hangar Roof Retrofit
Results
Macon, GA 31297

Decatur Legacy Park Stone Dairy Barn Stabilization
Alteration
Results
Decatur, GA 30030

Glynn County Fire Station 6 Roof Addition FY24
Renovation
Sub-Bidding
$300,000 CJ est. value
Brunswick, GA 31523

FY22 Re-Roofing Of Water Department Building
Alteration
Post-Bid
Douglas, GA 31533

North Avenue Apartments West Reroof
Alteration
Results
Atlanta, GA 30332

Police West Precinct Roof Replacement Project
Renovation
Sub-Bidding
$782,000 CJ est. value
Norcross, GA 30071

Prison TPO Roof Replacement
Alteration
Post-Bid
Newnan, GA 30263

2022 Historic Court House Roofing
Alteration
Results
Greenville, GA 30222

Shingled Roof Work for Clayton County
Renovation
Sub-Bidding
$200,000 CJ est. value
Jonesboro, GA 30236

Last Updated 07/11/2023 01:35 PM
Project Title

RFP Roofing replacement at Camden Middle School

Physical Address View project details and contacts
City, State (County) Kingsland, GA 31548   (Camden County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Camden County Board of Education is considering the services of a Construction Management Firm (CM/GC) for the construction of a project as (The "Project"). The CM/GC will assume responsibility for project construction cost by issuing a Guaranteed Maximum Price (GMP) not later than 90% through the design phase. The GMP will be a contractual obligation. CM/GC will also develop an overall project schedule, which will be a contractual obligation. In addition, CM/GC will be responsible for methods of construction, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and schedule. The project could be funded by combination of state and local funds. The CM/GC will be expected to work closely with the architect that has been assigned to the project. 1. Deadline for written questions and clarification on Request for Qualification. June 27, 2023 5:00 PM Five (5) bound copies, one (1) unbound copy and one electronic copy on CD, DVD, USB thumb drive, or equivalent of the qualifications shall be submitted. Submittal shall be bound using wire binding, three ring binder, etc. Loose files will not be accepted. All reports shall be submitted in a cardboard box. Each submittal shall be identical and include a transmittal letter. Proposers are encouraged to follow the sequence of the Initial Written Submittal in their responses. Responses should be concise, clear, and relevant. Proposer's cost incurred in responding to this Initial Written Submittal is proposers alone and the Owner does not accept liability for any such costs. Qualification submittals will be received until time and date shown in the Schedule of Events. Such qualification submittals must be typed on standard (8.5" x 11") paper. The pages of the qualification submittals must be numbered. A table of contents, with corresponding tabs, must be included as well to identify each section. Responses are limited to seventy (70) pages (may be less) using a minimum of 10-point Arial font. Any affidavits called for may be included in an appendix and will not count toward the page limit.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents