Similar Projects
Last Updated 03/11/2020 05:14 AM
Project Title

Reconstruction/Rehabilitation - Lexington Co

Physical Address View project details and contacts
City, State (County) SC   (Lexington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 1,020.000 Sy Removal & Disposal Of Existing Asphalt Pavement 100.000 Sy Unclassified Excavation 85.000 Cy Borrow Excavation 3,368.000 Cy Excavation For Shoulder Paving 406.570 Sta Hauling Of Excavated Shoulder Material 406.570 Sta Cement Modified Recycled Base (8" Unif)-Curing Method b 3,500.000 Sy Cement Modified Recycled Base (10" Unif)-Curing Method b 59,770.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 112,550.000 Sy Portland Cement For Cement Modified Recycled Base Course 6,951.000 Ton Maintenance Stone 113.500 Ton Hma Shoulder Widening Course 1,016.400 Ton Liquid Asphalt Binder Pg64-22 2,435.292 Ton Full Depth Asph. Pav. Patching 6" Unif. 500.000 Sy Full Depth Asph. Pav. Patching 8" Unif 4,350.000 Sy Milling Existing Asphalt Pavement 1.75" 900.000 Sy Milling Existing Asphalt Pavement 2.0" 121,750.000 Sy Milling Existing Asphalt Pavement 3.0" 15,200.000 Sy Milling Existing Asphalt Pavement (Variable) 6,975.000 Sy Milled-In Rumble Strip 22.480 Mi Hot Mix Asphalt Intermediate Course Type b 6,324.267 Ton Hot Mix Asphalt Surface Course Type b 14,417.227 Ton Hot Mix Asphalt Surface Course Type c 17,246.003 Ton Hot Mix Asphalt Surface Course Type d 509.360 Ton Driveway Paving-Surface Type c 3,573.875 Ton Driveway Paving-Surface Type d 262.500 Ton Permanent Construction Signs (Ground Mounted) 3,822.000 Sf Description Quantity Units 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 3,200.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 656,345.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 540.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 2,190.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 6,063.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 57.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 24,810.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 553,340.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 630.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,100.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 126,255.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 180.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 730.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,220.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 19.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 5,080.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 55,250.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 510.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 82.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 20.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,529.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 700.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 129,010.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 831.000 Lf White Word Message "Stop Ahead" -Sc Hybridized Polymer -20 Mil. 1.000 Ea 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 2,840.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 118,380.000 Lf Plastic Curbing With Dual Post 21.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 240.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 10,086.000 Lf Sawcut For Loop Detector 3,139.000 Lf Adjust Drop Inlet Adjust d. i. 1.000 Ea Detectable Warning Material 375.000 Sf Pedestrian Ramp Construction 750.000 Sy Mt3 Leading End Treatment Tl3 4.000 Ea Mgs3cs Gr Compressed Shoulder 200.000 Lf Permanent Grassing For Non-Permitted Resurfacing Projects 16.380 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents