Similar Projects
Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

Fire Stations - City of Springfield
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Springfield, OH 45505

PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

Roadway Minor Rehab - SR 11
Infrastructure
Design
$3,250,000 CJ est. value
Jefferson, OH 44047

RFQ Engineering - Green Ridge Road Slip Repair, PIK-CR2-0.87
Infrastructure
Bidding
$117,000 CJ est. value
Peebles, OH 45660

Athens - West Union Street
Infrastructure
Bidding
$6,330,336 CJ est. value
Athens, OH 45701

RFQ Construction Manager at Risk - SP Lodge Improvements-Mohican and Salt ForkFY21/22
Renovation
Post-Bid
$24,415,000 CJ est. value
Lore City, OH 43755

Indian Creek and Tranquility Shooting Range Improvements
Renovation
Post-Bid
Fayetteville, OH 45118

Miscellaneous Site Work - Various Sites
Infrastructure
Results
Martins Ferry, OH

Loveland Safety Center Parking Improvements
New Construction, Infrastructure
Results
$149,168 est. value
Loveland, OH 45140

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Melody Parks
New Construction, Infrastructure
Pending Verification
$484,400,000 CJ est. value
Springfield, OH 45505

Storm Sewer - City Of Fairfield
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Fairfield, OH 45014

Anderson Farm Residential Subdivision
New Construction, Infrastructure
Conception
$2,300,000 CJ est. value
West Chester, OH 45069

Roadway Minor Rehab - US 322
Infrastructure
Design
$2,076,000 CJ est. value
East Orwell, OH 44076

Last Updated 02/09/2023 06:33 PM
Project Title

Tappan Lake Park Welcome Center Building and Site Work

Physical Address View project details and contacts
City, State (County) Deersville, OH 44693   (Harrison County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,690,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT DESCRIPTION A. Work of the Project includes construction of a new Welcome Center at Tappan Lake Park. Along with the Welcome Center the project includes site improvements and utility upgrades. The New Tappan Welcome Center is based upon the Welcome Center built in 2015 at Atwood Lake Park with minor modifications to the floor plan and site plan. The Project includes all procurement, labor and materials for a complete and fully functional facility and supporting site. B. Perform Work of Contract under stipulated sum Contract with Owner according to Conditions of Contract. Question Deadline: 01/19/2023 at 5:00 PM ET Any questions shall be directed to James Dobrozsi, Woolpert, inc., in writing by email at james.dobrozsi@woolpert.com No pre-bid meeting will be held for this bid cycle. Each bidder must deposit with his bid, security in the amount and form as stated in the Instructions to Bidders. Bids shall be subject to the condition that the right is reserved to hold bids for a period not longer than 60 days after date of opening and/ or to award at any time during the period. State of Ohio Prevailing Wage Rates for Harrison County will be applicable to this project. Current prevailing wage rates are available at the Department of Commerce, Division of Industrial Compliance website (see link below). The MWCD reserves the right to reject any and all bids, or to increase, to decrease or omit any item or items and/ or to award to the lowest and most responsible, responsive bidder. The MWCD also reserves the right to waive any informalities or irregularities in the Bid received. Bidder agrees that the following Interim Milestones shall be completed as part of the construction sequence in accordance with Section 01 10 00 Summary of Work: A. Milestone Completion Date 1. Building - Subs. Com. (move in) - March 15, 2024 B. Substantial Completion Date 1. Following demo, new parking - April 15, 2024 C. Final Completion Date 1. May 15, 2024

Details

1 Story Above Grade, 3,900 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents