Similar Projects
Huger Street and King Street Water Main Replacement Project
Bidding
Charleston, SC 29401

Ben Sawyer Intracoastal Waterway Water Main Crossing
Bidding
Charleston, SC 29401

Water Pipeline Pigging Project
Post-Bid
Mount Pleasant, SC

Water Main Replacement East Arctic to East Cooper Avenues
Post-Bid
Folly Beach, SC

Phase II I and I Reduction Project - Wastewater Collection System I and I Rehabilitation
Results
Sullivan's Island, SC

Splash Island Water and Sewer Line Replacement
Results
Less than $168,200 est. value
Mount Pleasant, SC 29464

Access Road Water Main Relocations Phase I-E: Stromboli and Spruill Connectors
Post-Bid
Mount Pleasant, SC 29464

Backflow Device Testing
Term Contract
Results
Anderson, Beaufort, Bennettsville, Camden, Charleston, Chester, Columbia, Conway, Darlington, Eastover, Florence, Fountain Inn, Gaffney, Georgetown, Graniteville, Greenville, Greer, Hartsville, Hodges, Laurens, Manning, Marion, Moncks Corner, Mullins, Newberry, North Charleston, Plum Branch, Summerville, Timmonsville, Union, Varnville, Wellford, West Columbia, SC 29172

Unplanned/On-Call Water System Improvements
Post-Bid
Charleston, SC 29403

Replacement of Underground Piping on Coming Street
Results
Less than $50,000 est. value
Charleston, SC 29424

Extension of the Sewer Line and Two (2) Water Services at Oakbrook Middle School
Post-Bid
Ladson, SC 29456

Pump Station 92 Force Main - Phase II Repair
Post-Bid
Charleston, SC 29402

Clements Ferry Road Water and Wastewater Relocations Phase 2
Post-Bid
Charleston, SC 29401

Beach Club Villas Water Main Replacement
Post-Bid
Isle of Palms, SC 29451

Elliott Cut Crossing 20-Inch Water Transmission Main Project
Post-Bid
Charleston, SC 29401

Last Updated 07/08/2019 06:14 AM
Project Title

Back Flow Preventer - Charleston

Physical Address View project details and contacts
City, State (County) SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Furnish materials and labor to clean out outlet of 36" RCP and install 36" checkmate inside existing pipe.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents