Similar Projects
EHRM Infrastructure Upgrades Design-Build
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
McClellan, CA 95652

Public Safety Power Shutoff (PSPS) California Exposition and State Fair
Renovation
Sub-Bidding
$100,000 CJ est. value
Sacramento, CA 95814

Electronic Smoke and Fire Detection Alarm System
Renovation
Sub-Bidding
$175,000 CJ est. value
Sacramento, CA 95814

CHP HQ Generator Maintenance
Term Contract
Post-Bid
Sacramento, CA

Emergency Generator Maintenance- Multiple Locations
Term Contract
Post-Bid
Elverta, CA

Data Center Maintenance and Portable Power and Cooling
Alteration
Results
Sacramento, CA 95827

Tracy Substation Circuit Breaker Replacement Project
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Folsom, CA 95630

Valley Division Office- Generator Maintenance Services
Term Contract
Post-Bid
Sacramento, CA 95818

Fire Station 2 Communication Center UPS Replacement
Alteration
Results
Less than $175,000 est. value
Sacramento, CA 95202

Solar Panel Maintenance and Energy Monitoring Services
Alteration
Post-Bid
Sacramento, CA

Transformer Repair/Service
Term Contract
Results
Folsom, CA 95630

Hydro Turbine Machining Services for the Upper American River Project
Term Contract
Post-Bid
Sacramento, CA

Streetlights on Coyle Avenue Hillsdale Boulevard and Watt Avenue
Infrastructure
Results
Sacramento, CA 95811

Electrical Testing at Various Department of Utilities Facilities
Term Contract
Post-Bid
Sacramento, CA 95814

Fountain Pump Electrical Upgrade
Alteration
Results
$75,000 est. value
Sacramento, CA 95815

Last Updated 06/02/2023 08:04 PM
Project Title

Pump Station Generators - Re-bid

Physical Address View project details and contacts
City, State (County) Rancho Cordova, CA 95670   (Sacramento County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $880,910 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract consists, in general, of furnishing all labor, materials, tools, equipment, incidentals, and for doing all work necessary for procurement and installation of four standby generators at four flood control drainage pump stations, including all conduit, conductors, and appurtenances for fully operational standby power systems; and onsite work performed as required for the fulfillment of the Contract. The Contractor shall coordinate with the City Engineer throughout the Project to accommodate any adjustments, as deemed necessary by the City Engineer. Any questions or clarifications on the special provisions that may require a formal bid addendum must be submitted by 5:00 p.m. on February 23rd, 2023. The City will review the questions and issue a bid addendum if necessary. EST. TOTAL CONSTRUCTION COST: $900,000 Any questions or clarifications on the special provisions that may require a formal bid addendum must be submitted by 5:00 p.m. on May 16th, 2023. The City will review the questions and issue a bid addendum, if necessary, by 5:00 p.m. on May 19th. Questions submitted after May 16th, 2023, may not generate a formal response. Time for completion of this contract shall be ONE HUNDRED FIVE (105) WORKING DAYS, SEPARATED INTO MILESTONE A AND MILESTONE B. Milestone A (FORTY-FIVE (45) WORKING DAYS) will consist of submittal of all required Milestone B (SIXTY (60) WORKING DAYS) will consist of generator installation with associated electrical work at each of the drainage pump stations. Milestone B shall be activated upon receipt of the generators. All Bids has been rejected.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents