Similar Projects
Floating Dock Materials – Danbury Fire Department
Bidding
Danbury, CT

Z--Design-Build Nautilus Pier Water Taxi Dock, NAVSUBASE New London, CT
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Groton, CT 06349

Design-Bid-Build, P1097 Relocate Underwater Electromagnetic Measurement System
Post-Bid
$1,000,000 to $5,000,000 est. value
New London, CT

Marine Construction and Maintenance Service
Term Contract
Results
Greenwich, CT

Annual Servicing of Anchorage Markers and Dock Floats
Results
Essex, CT

Ferry Slip
Construction
New London, CT

Nautilus Pier Water Taxi Dock
Post-Bid
Groton, CT 06340

P898, Replace Pier 32 at NAVSUBASE New London, CT
New Construction, Demolition
Results
$25,000,000 to $100,000,000 est. value
Groton, New London, CT 06340

Branford Point Seawall and Wharf Repair
Post-Bid
Branford, CT

New London Waterfront Repairs and Maintenance
Results
New London, CT

Design, Fabrication and Installation Services for Baldwin Bridge State Boat Launch Floating Dock Systems
Post-Bid
Old Saybrook, CT 06475

Marine Inspection and Repair Services
Term Contract
Results
Groton, CT

New Business Venture - Waterfront Promenade
Post-Bid
New London, CT

Thames River Marina Dock Removal Project
Results
Waterford, CT 06385

Construction Manager at-Risk (CMR) for Infrastructure Improvements to Connecticut State Pier
Results
New London, CT 06475

Reported 03/13/2020 12:45 AM
Project Title

Replace/Repair Dock System at Marina

Physical Address View project details and contacts
City, State (County) Danbury, CT 06812   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization and demobilization, demolition, staging and legal disposal of portions of the existing floating dock marina. Furnish and install helical anchors and associated hardware. Work shall include the re-aligning and relocation of the existing docks. Furnish and install elastic rode brackets on existing Dock 2, 3, 4, Main and Transition Dock. Furnish and install mooring hawsers, lines, shackles, and all related components by Seaflex® or approved equal. Connect anchor system to anchors and docks at specified tension. Furnish and install proposed new dock spacers with aluminum framed floating docks with Ipe decking, cleats, rub rails, hinge connections, elastic rode brackets, associated hardware on the Dock 1, Main Dock and Transition Dock. Furnish and install 4’ wide x 12’ long ADA compliant gangway, transition plate and wear plate by Ravens Marine, Inc. or approved equal.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents