Similar Projects
Waterfield Bldg. Ceiling Modernization Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Norfolk, VA

Heat Exchanger Repair
Renovation
Bidding
$600,000 CJ est. value
Norfolk, VA 23510

Merv Air Filters
Term Contract
Sub-Bidding
Staunton, VA 24401

LERF Chiller Replacement
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Newport News, VA 23606

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace HVAC, Bldg SP-366
Results
$500,000 to $1,000,000 est. value
Norfolk, VA

HVAC Services
Term Contract
Results

Solar Installation and/or Solar Power Purchase Agreement Services for Fire Stations 2,12 and 16
Renovation
Sub-Bidding
$330,000 CJ est. value
Norfolk, VA 23510

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Service Culpeper District
Term Contract
Results

Half Moone Cruise Terminal Cooling Tower Addition
Renovation
Sub-Bidding
$600,000 CJ est. value
Norfolk, VA 23510

Bldg 100, Replace Chiller, LRA
Term Contract
Post-Bid
Norfolk, VA

Hiden Hussey/Commons Dining Hall Select Roof and HVAC Replacement
Results
$200,000 to $299,999 est. value
Newport News, VA

CHL Cooling Tower Improvements
Renovation
Sub-Bidding
$500,000 CJ est. value
Newport News, VA 23606

Last Updated 09/14/2022 02:07 PM
Project Title

Sawdust Handling System Repair - Critical Repair

Physical Address View project details and contacts
City, State (County) Craigsville, VA 24430   (Augusta County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Quick Quote is to contract with one (1) Contractor to repair one (1) Sawdust Handling System - Critical Repair at Augusta Correctional Center, Power Plant. 1. Repair one (1) sawdust handling system 2. Furnish all labor, material, equipment, incidentals, and travel necessary to complete repair 3. Remove the damaged and deteriorated elevated section of the sawdust ductwork shoot and the top cap of the bucket elevator 4. Fabricate and install new section for the damaged and deteriorating ductwork feed system with a new shoot and top cap of the bucket elevator 5. Perform work during normal working hours. Monday through Friday 8:00 a.m. - 4:00 p.m. 6. Provide to the Purchasing Agency, a current Certificate of Insurance (COI) upon award of Contract. Work will not begin on DOC property until a current COI is received. New materials will consist of 11 gauge carbon steel with a 2' x 2' steel frame with access panels on each end of the shoot and replace required insulation. The purpose of the Mandatory Site-Visit is to allow potential bidders an opportunity to present questions and obtain clarification relative to any facet of this solicitation. Any bidder who has visited the job site to inspect the full scope of work to be completed and confirmed by DOC will not be required to attend.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents