Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Results
$7,000,000 to $10,000,000 est. value
OR

Cornelius Pass Road Arterial Corridor Management Project On The Cornelius Pass Highway (RT. No. OR127) Near Portland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Hall-Watson Loop Improvements - 5120 - City of Beaverton
Renovation, Infrastructure
Conception
$5,860,000 CJ est. value
Aloha, OR 97007

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Aspahlt Paving and Repair
Infrastructure
Post-Bid
$200,000 est. value
Beaverton, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Last Updated 04/25/2023 08:19 AM
Project Title

2022 Road Fund Maintenance Overlay Project

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97123   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,084,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract consists of the following in Washington County: o Implement temporary traffic control and temporary pollution control measures o Trim vegetation adjacent to and above the roadway related to contract operations o Perform Cold Plane Pavement Removal o Place 2" of Level 2, 1/2 " Dense ACP and Level 3, 1/2 " Dense ACP on Washington County roads o Place 3/4 "- aggregate for road shoulders o Place pavement markings as required o Additional and incidental Work as called for by the Specifications The Contractor shall complete all Work to be done under the Contract for 185th Avenue and Kinnaman Road not later than September 2, 2022. All paving Work to be done under the Contract for Bethany Boulevard is to be completed not later than September 2, 2022. PRE-BID MEETING The County will not hold a pre-bid meeting for this project. This Work shall consist of installing monument frames and covers at the locations designated by the Engineer. Manholes, valves and boxes shall be adjusted to grade during each lift of paving with the use of riser rings or valve sleeves. Install barriers prior to grinding to prevent grindings from filling or obstructing catch basins, bridge weep holes and other structures. Immediately remove the barriers when grinding operations are completed near the structure. Should material enter any structure immediately halt the grinding operation and clean the structure of all foreign material before resuming grinding operations. Remove all the material to the face of curb or gutter as appropriate. If grinding machines are not capable of removing all material adjacent to curbs, gutters, structures or other items, use alternate methods of material removal. Do not damage signal loop street boxes during grinding process. All remaining Work is to be completed no later than September 30, 2022. The Project cost range is $2,250,000 - $3,250,000 Bids submitted after the above stated time will not be accepted. Bids must include: o A residency statement as defined in ORS 279C.365. o A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. Addenda will ONLY be made available on the OpenGov Procurement website. BIDDERS: Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026 prior to submitting a bid. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the county in these bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the OpenGov Procurement website prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit the First-tier Subcontractors Disclosure Form provided, either with the bid, or using a separate, linked solicitation on the OpenGov Procurement site. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). First Tier Subcontractors Disclosure forms submitted via email will not be accepted. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. THE COUNTY: The County reserves the right to waive any irregularities or informalities. Plan Holder's List and Bid Results: Information regarding plan holder lists and bid results will only be available on the OpenGov Procurement website. Questions: Submit questions only in writing on the County's OpenGov Procurement Portal (https://secure.procurenow.com/portal/washington-county-or) with the Question/Answer feature on the project page. Replies to these questions will be posted on the County portal as well. PROJECT STAFF WILL ONLY RESPOND TO QUESTIONS SUBMITTED IN WRITING Project Contacts: Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7816 Fax: 503-846-7810 Stephen Cruise, Project Manager 1400 SW Walnut St, MS #51 Hillsboro, OR 97123-5625 Phone: 503-846-7623 Fax: 503-846-7620 Published Mar. 28, 2022. 12102664 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents