Reported | 03/15/2022 12:00 AM |
Project Title | Overlay and Chip Seal Lodgepole Road Kalispell Area |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: MT |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 3,657 tons of 1/2” Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved 0.15 feet thick and approximately 25 feet wide. Contractor will taper mill full width at both ends of the project, starting at 0.15 deep, tapering to 0.0 at 100’. Centerline rumble strips shall be re-applied full length at completion of overlay. Approximately 20 approaches and 1 turnout along this route will get 3’ aprons along them as per Project Manager direction. Include apron costs in plant mix item. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 33,760 square yards of laid-in-place chip seal. The chip seal will be approximately 2.4 miles long and 24 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at 0.45 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above. The Department will provide final striping. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |