Similar Projects
Last Updated | 11/29/2022 09:07 AM |
Project Title | Lyons Township High School - 2023 North Building Clay Tile Roof Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | La Grange, IL 60525 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $576,000 [brand] Estimate |
Plans Available from | Copy Center - 09/26/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Lyons Township High School - 2023 North Building Clay Tile Roof Replacement Project The Work shall take place at the North Campus. The work includes, but is not limited to, replacement of the existing clay tile roofs facing Cossitt Ave at the Main North Building, including the main entry tower and a portion along Park Road and all associated work. Work is to be awarded as a single contract. Refer to the Drawings and Project Manual for the full extent of the Work. Each Bid must be accompanied by a Bid Guarantee that shall be not less than 10 percent of the amount of the Base Bid, and at the option of the Bidder may be a Certified Check, Bank Draft, or a Bid Bond, secured by a Guarantee or Surety Company. Certified Check must be made payable to the order of Lyons Township High School District No. 204. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. The Owner reserves the right to reject any or all bids, to waive irregularities in the bidding procedure, or accept the Bid that, in its opinion, will serve the best interest of the School District. Any such decision shall be considered final. The Owner reserves the right to set aside a Bid from a Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project. The bidder shall have a written sexual harassment policy in place in full compliance with Section 2-105 of the Illinois Human Rights Act Bidding documents will be available at cost to Pre-qualified Roofing Contractors only. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |