Similar Projects
Y--Slick Rock Culverts
Design
$200,000 to $400,000 est. value
Safford, AZ

Highway 70 and 2nd Avenue Drainage Improvements
Bidding
Safford, AZ

Route N9702-Sawmill/Whiteclay
Post-Bid
Sawmill, AZ

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ 85546

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

F--Navajo Nation-Cove Mesa II Erosion Control
Results
$1,000,000 to $5,000,000 est. value
Red Rock, AZ

Phase 1 - Infrastructure AKA Hillside Drive
New Construction
Construction
Phoenix, AZ 85338

Indefinite Delivery / Indefinite Quantity (IDIQ) Irrigation Canal Construction
Post-Bid
$250,000 to $1,000,000 est. value
San Luis, AZ

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

Subgrade Preparation, Road Reconditioning, Soil Stabilization, Gravel Base, Double Chip Seal and Signage
Post-Bid
Window Rock, AZ 86515

Upper San Simon Culvert Bridge Replacement
Results
Safford, AZ

Subgrade Preparation, Road Reconditioning, Gravel Base, Double Chip Seal, Culvert Installation and Signage
Post-Bid
Window Rock, AZ 86515

Colorado River Wash Fan Sediment and Rock Removal IDIQ for Arizona, California and Nevada
Results
$250,000 to $1,000,000 est. value

Route N6730 - Tolani Lake Chapter; Low Water Crossing
Post-Bid
Window Rock, AZ

Western Canal Crossing Improvements
Results
Less than $97,855 est. value
Chandler, AZ

Reported 12/31/2020 12:00 AM
Project Title

Annual Culvert Pipe

Physical Address View project details and contacts
City, State (County) Safford, AZ   (Graham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. All pipes shall be furnished in 20-foot long joints. 2. Price of pipe shall include (one) band (16 Gage Min) with bolts for each 20 foot joint of each size pipe. 3. Quantity of each size of pipe will be on an “as needed” basis with 10 (ten) working days notification given for size and quantity specified per order. 4. Bid cost per foot price of each size of pipe specified below shall remain in effect from January 4, 2021 to December 31, 2021.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents