Similar Projects
Evolve Biologics Manufacturing Facility
New Construction
Conception

US 80 - Reconstruct Existing Roadway and Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$119,542,801 CJ est. value
Terrell, TX 75160

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

IH0020 - Full Depth Concrete Repair
Infrastructure
Bidding
$343,650 CJ est. value
Terrell, TX 75160

USPS Forney, TX - MPO Building Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,500,000 CJ est. value
Forney, TX 75126

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Earthwork Improvements to Serve Arbordale Village 2
Infrastructure
Post-Bid
TX

Earthwork Improvements Windmill Farms 6B
Infrastructure
Results
Forney, TX

Grading Improvements for Eastland, Phases 1A and 2A
Infrastructure
Results
TX

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

Crossroads at Terrell Phase 2
New Construction, Infrastructure - 366,577 SF
Design
$43,885,000 CJ est. value
Terrell, TX 75160

RFQ Construction Manager - Municipal Facility
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Talty, TX 75160

Construction of the Grading Improvements or Wildcat Ranch, Phase 4
Infrastructure
Post-Bid
TX

Walden Pond West Phase 1 Grading Improvements
Infrastructure
Results
TX

Last Updated 08/29/2022 10:01 AM
Project Title

Project Owl / Building 1

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $32,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 26, 2022, this project has been registered with the Texas Department of Regulation. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin June 2022 and be completed February 2023. Scope of Work: The Scope of This Project Includes One (1) Cold Dark Shell Industrial Building Without a Mezzanine. There Will Be a Total of Three (3) New Inustrial Buildings on the Project Site. Square Footage: 817,400 Ft 2 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

817,400 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents