Similar Projects
Bridport-Cornwall STP FPAV (45) and Bridport-Middlebury Hes Rmbl (5)
Bidding
$500,000 to $1,000,000 est. value
Bridport, Cornwall, Middlebury, VT

Garage Onsite Wayfinding Signage Program
Post-Bid
Burlington, VT 05401

Old Town Hall Informational Panels
Post-Bid
Mendon, VT

Statewide NW STPG Sign (63)
Results
$250,000 to $500,000 est. value

Statewide NW STPG Sign (63)
Results
$250,000 to $500,000 est. value

Wayfinding Project
Post-Bid
Burlington, VT

Statewide SW STPG Sign (64)
Results
$250,000 to $500,000 est. value

Downtown Rutland Pedestrian Wayfinding Signage 2020
Post-Bid
Rutland, VT 05702

Charlotte STP 2035 (23) and Ferrisburgh STP 2035 (24) and Ferrisburgh STP 2035 (25) and Ferrisburgh STP 2035 (26)
Results
$1,000,000 to $2,500,000 est. value
Charlotte, Ferrisburg, VT 05445

Portable Changeable Message Signs and Portable / Temporary Traffic Signal
Term Contract
Post-Bid
$300,000 est. value

Norwich STP 2034 (18)
Results
$250,000 to $500,000 est. value
Norwich, VT 05055

Street Maintenance Program Line Striping 2021
Post-Bid
Colchester, VT

W-Beam Guardrail at the Pearl Street Culvert
Results
Rutland, VT

Supply and Installation of: Runway 15 – 33 and Runway 1 – 19 Pavement Paint Marking
Post-Bid
South Burlington, VT 05403

Street Maintenance Program - Line Striping 2020
Results
Colchester, VT 05446

Last Updated 05/20/2020 07:24 AM
Project Title

Statewide NW STPG Mark (315)

Physical Address View project details and contacts
City, State (County) State-Wide: VT
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be Performed as Part of this Project includes Application of Center Line, Edge Line and Lane Edge Markings on National Highway and State System Roads. Application of Center Line Markings Only on Class 1 and Class 2 Town Highways within the Northwest Region (District 5, District 8). Location: National Highway and State System Roads, Class 1 and Class 2 Town Highways within the Northwest Region (District 5, District 8). 608.50 0005 Truck-Mounted Attenuator, Awv/Pv 1,900.000 Hr 635.11 0010 Mobilization/Demobilization 1.000 Ls 641.10 0015 Traffic Control 1.000 Ls 646.201 0020 4 Inch White Line, Waterborne Paint (Data Logging Included) 13,500,000.000 Lf 646.2111 0025 4 Inch Yellow Line, Waterborne Paint (Data Logging Included) 29,000,000.000 Lf 646.2141 0030 6 Inch White Line, Waterborne Paint (Data Logging Included) 175,000.000 Lf 646.2151 0035 6 Inch Yellow Line, Waterborne Paint (Data Logging Included) 175,000.000 Lf 646.221 0040 8 Inch White Line, Waterborne Paint 5,000.000 Lf 646.241 0045 12 Inch White Line, Waterborne Paint 10,000.000 Lf 900.615 0050 Special Provision (Uniformed Traffic Officers) (n.a.b.i.) 3,500.000 Dl

Details

Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents