Similar Projects
16" Water Main - Signal Butte Road, Pecos Road to Germann
Bidding
$1,400,000 to $1,600,000 est. value
Mesa, AZ 85213

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Bidding
Buckeye, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Professional Services for Water Main Replacements
Bidding
$5,000,000 est. value
Chandler, AZ

Professional Services For Loop 101 And 202 Freeway Waterline And Sewer Rehabilitation City
Post-Bid
Chandler, AZ

Water Meters
Results
Glendale, AZ 85301

Professional Services for Water Main Replacements 2019 - Westwood Manor, Kingston and Chieftain Village
Bidding
Chandler, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

Water Main Replacements
Bidding
$1,000,000 to $5,500,000 est. value
Chandler, AZ

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

Airport Drive Water Line
Results
$142,734 to $261,969 est. value
Queen Creek, AZ 85142

Last Updated 08/26/2020 07:47 PM
Project Title

Cave Creek and Lone Mountain Waterline Connection - CMAR

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85003   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide preconstruction services and complete construction services for Cave Creek and Lone Mountain Waterline Connection Construction Manager at Risk (CMAR) project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project along with coordinating with 10A-B1 Booster Pump Station (BPS) Improvement CMAR contractor (selected through a separate advertisement).The project sites are 16” Waterline in Cave Creek Road (starting at 10A-B1 and between Cave Creek Rd. and Carefree Hwy.), and 16” Waterline in Lone Mountain Road (between Cave Creek Road and 56th St.).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents