Similar Projects
Interior Painting Services for Sumner Avenue Elementary School
Bidding
Less than $45,000 est. value
Springfield, MA 01108

Boiler Replacement, Agawam Junior High School, MSBA Accelerated Repair Program - General Bids
Bidding
Less than $850,000 est. value
Feeding Hills, MA 01030

Boiler Replacement, Agawam Junior High School, MSBA Accelerated Repair Program - Filed Sub-Bids
Sub-Bidding
Less than $850,000 est. value
Feeding Hills, MA

Cooling Upgrades, Springfield Data Center
Sub-Bidding
Less than $328,890 est. value
Springfield, MA 02108

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Pool Painting and Miscellaneous Repair
Post-Bid
Less than $50,000 est. value
Longmeadow, MA

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Removal and Replacement of Governors of Hydroelectric Units
Results
Westfield, MA

Cooling Upgrades, Springfield Data Center
Bidding
Less than $328,890 est. value
Springfield, MA 02108

Interior Painting - Wilbraham Public Library
Post-Bid
Less than $49,000 est. value
Wilbraham, MA

On-Call Backup Mechanical Contracting Services
Term Contract
Results
$150,000 est. value
Springfield, MA

J--Electrical Services BOA
Post-Bid

Aeration Upgrades Project - General Bid
Results
Less than $450,000 est. value
Chicopee, MA

Electric Conductor Cable
Term Contract
Post-Bid
Less than $50,000 est. value
Westfield, MA

Aeration Upgrades Project - Sub Bid
Results
Less than $450,000 est. value
Chicopee, MA

Last Updated 12/17/2018 10:05 AM
Project Title

Kelly Elementary School Window Replacement - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Holyoke, MA   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,127,685
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Estimated Cost $100,000 DCAMM Certificate The Project consists of: The Project consists of abatement and demolition of existing window and door and installation of new windows, doors, painting HVAC and electrical connections/ feeds to the new window air conditioners, and misc. upgrades as shown on the drawings.
Details
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents